There is no risk to the integrity of data using the P3 import function as long as your data is correct. There is a technical article on my web site that explains how to import through Excel, but always back up you file before commencing.
To delete all the relationships in a P3 project I usually delete the ***REL.P3 and replace it with a file from a project that has no relationships and rename as required.
Paul E Harris
Eastwood Harris Pty Ltd, Melbourne, Australia
Planning and Scheduling Training Manual & Book Publishers, Consulting and Training
Member for
24 years 6 monthsRE: Removing the majority of links from an existing plan
There is no risk to the integrity of data using the P3 import function as long as your data is correct. There is a technical article on my web site that explains how to import through Excel, but always back up you file before commencing.
To delete all the relationships in a P3 project I usually delete the ***REL.P3 and replace it with a file from a project that has no relationships and rename as required.
Paul E Harris
Eastwood Harris Pty Ltd, Melbourne, Australia
Planning and Scheduling Training Manual & Book Publishers, Consulting and Training
www.eh.com.au
Member for
18 years 9 monthsRE: Removing the majority of links from an existing plan
check out http://www.planningplanet.com/forum/forum_post.asp?fid=&Cat=2&Top=44743
regards
deb