Primavera Project Planner - P3 Member for 20 years 6 months Member for 20 years 7 months Submitted by Zhang Haixiang on Tue, 2006-05-23 03:15 Permalink RE: achievable schedule??? to use informaker, you need install ODBC driver and config data source,then you can open your project in informaker for reporting. there are lots of threads about link MS-Access with P3, MS-access is more easy and powerful than informaker. In most case, export to excel is enough, if this does not work, try Access. No need to learn informaker. Member for 19 years 11 months Member for 20 years Submitted by AALAP PAREKH on Tue, 2006-05-23 01:15 Permalink RE: achievable schedule??? hi 1) can u one tell me how infomakes useful 2 us? i don wats it? thnk its link???m confused Member for 20 years 6 months Member for 20 years 7 months Submitted by Zhang Haixiang on Tue, 2006-05-23 00:04 Permalink RE: achievable schedule??? first set the start date of the project, then assign duration for each activity then link all acvities with relationship. P3 will caculate ES,EF for you. If the duration and relationship is reasonable based on your resource availability, then the schedule is achievable. Log in or register to post comments
Member for 20 years 6 months Member for 20 years 7 months Submitted by Zhang Haixiang on Tue, 2006-05-23 03:15 Permalink RE: achievable schedule??? to use informaker, you need install ODBC driver and config data source,then you can open your project in informaker for reporting. there are lots of threads about link MS-Access with P3, MS-access is more easy and powerful than informaker. In most case, export to excel is enough, if this does not work, try Access. No need to learn informaker.
Member for 19 years 11 months Member for 20 years Submitted by AALAP PAREKH on Tue, 2006-05-23 01:15 Permalink RE: achievable schedule??? hi 1) can u one tell me how infomakes useful 2 us? i don wats it? thnk its link???m confused
Member for 20 years 6 months Member for 20 years 7 months Submitted by Zhang Haixiang on Tue, 2006-05-23 00:04 Permalink RE: achievable schedule??? first set the start date of the project, then assign duration for each activity then link all acvities with relationship. P3 will caculate ES,EF for you. If the duration and relationship is reasonable based on your resource availability, then the schedule is achievable.
Member for
20 years 6 monthsRE: achievable schedule???
to use informaker, you need install ODBC driver and config data source,then you can open your project in informaker for reporting.
there are lots of threads about link MS-Access with P3,
MS-access is more easy and powerful than informaker.
In most case, export to excel is enough, if this does not work, try Access. No need to learn informaker.
Member for
19 years 11 monthsRE: achievable schedule???
hi
1) can u one tell me how infomakes useful 2 us?
i don wats it? thnk its link???m confused
Member for
20 years 6 monthsRE: achievable schedule???
first set the start date of the project,
then assign duration for each activity
then link all acvities with relationship.
P3 will caculate ES,EF for you.
If the duration and relationship is reasonable based on your resource availability, then the schedule is achievable.