Yes, it is for a presentation to show the Critical Paths in the Project, as a flow chart pattern ( not bar chart). I was thinking to prepare it in excel first, but since it is taking too much time, I tried to develop it from the P6 itself (activity network), but it is too small to read.
Is it possible to copy the activity network from P6 and copy it in excel.
BR
Kannan
Member for
16 years 3 months
Member for16 years4 months
Submitted by Zoltan Palffy on Wed, 2018-12-05 17:00
Kannan, I'm not sure what you wanted to do, but of course for large projects with thousands of activities, it would be impossible to contain what you want even in A0 size paper. Is it for presentation and analysis? If it is, then for me, it would still not be practical and of course chaotic when you were in a conference room with so many heads looking on the same paper, and maybe your client is smoking a cigar. Why not use a wide video or movie screen instead?
Member for
17 years 4 monthsThanks ZoltanBRKannan
Thanks Zoltan
BR
Kannan
Member for
17 years 4 monthsHi Anoon,Yes, it is for a
Hi Anoon,
Yes, it is for a presentation to show the Critical Paths in the Project, as a flow chart pattern ( not bar chart). I was thinking to prepare it in excel first, but since it is taking too much time, I tried to develop it from the P6 itself (activity network), but it is too small to read.
Is it possible to copy the activity network from P6 and copy it in excel.
BR
Kannan
Member for
16 years 3 monthsuse 11x17
use 11x17
Member for
19 years 1 monthKannan, I'm not sure what you
Kannan, I'm not sure what you wanted to do, but of course for large projects with thousands of activities, it would be impossible to contain what you want even in A0 size paper. Is it for presentation and analysis? If it is, then for me, it would still not be practical and of course chaotic when you were in a conference room with so many heads looking on the same paper, and maybe your client is smoking a cigar. Why not use a wide video or movie screen instead?