1. BOQ = Bill of Quantities. This is a listing of all of the materials and works to be accomplished as part of the contract. BoQ is a very 'English' concept, derived from the old 'Standard Method of Measurement (SMM7) for more up to date information see: https://www.designingbuildings.co.uk/wiki/Standard_Method_of_Measurement_SMM7
2. Drawings tell you what needs to be built (ie, the design you are required to tender against and build if successful).
Member for
7 years 3 monthsThank brother
Thank brother
Member for
24 years 9 months1. BOQ = Bill of
1. BOQ = Bill of Quantities. This is a listing of all of the materials and works to be accomplished as part of the contract. BoQ is a very 'English' concept, derived from the old 'Standard Method of Measurement (SMM7) for more up to date information see: https://www.designingbuildings.co.uk/wiki/Standard_Method_of_Measurement_SMM7
2. Drawings tell you what needs to be built (ie, the design you are required to tender against and build if successful).
3. Formulating the estimate is then a very skilled activity, for some ideas see: https://mosaicprojects.com.au/WhitePapers/WP1051_Cost_Estimating.pdf