every type of work is different so depending on your type of work you will have minmum requirements that are on evry project that you do. You use this minimum requirement matrix as the baisis for starting and then add the project specifics to it based on that particular project. 

if is it electrical design and cosntruction you will always have power load calculation requirments, lighting calculations, single line drawings, switch gear submittals etc.