Jaroslava Sedrlova wrote:-My friend sent me project in pdf. There is no way to open a pdf as a workable schedule….you will need to get a PRX file…ask for a compressed backup or re-enter the data.
Alexandre Faulx-Briole and Sukumaran Subaramaniyan made good suggestions on breaking up the schedule however be careful.
With Alexandre’s method you will need to review the downstream constraints each time you reschedule one of the sections of the schedule.
With Sukumaran’s method you should break it so the relationships all flow one way ie from project 1 to project 2 then onto project 3 as you can then schedule the project in sequence once and the correct dates will be calculated. The moment you go back to an earlier project you would need to reschedule that project in the correct sequence to get valid dates on all activities.
Hope this helps.
Member for
20 years 8 months
Member for20 years8 months
Submitted by Sukumaran Suba… on Thu, 2005-04-21 23:23
Ask your friend forward to you the back up PRX file. You do not need to redo the schedule, just restore and work on it.
Check whether the message is still popping out. If yes, you split the schedule to a smaller workpackages and create a project group template.
Using project group template copy the smaller workpackages as a subproject and interlink the related activities. With project group you can manage all the workpackages simultaneously and efficiently. This might help you to solve the problem.
For more info go to help and read through the Project Groups.
Regards.
Member for
22 years 9 months
Member for22 years9 months
Submitted by Alexandre Faul… on Thu, 2005-04-21 03:47
I dont think that its my case. The project has less than 200 activities. My friend sent me project in pdf. I can see the result but I cant see information what I need for my bachelor
work.
If anybody can help me I will be very happy.
Have a nice day.
Member for
20 years 9 months
Member for20 years10 months
Submitted by kamran hazini on Wed, 2005-04-20 14:23
Another thing is that P3 has limitation for showing activities more than 32000 and it recommends applying filters to select group of activities. Please make sure this is not your case.
Member for
20 years 6 months
Member for20 years6 months
Submitted by Jaroslava Sedrlova on Tue, 2005-04-19 08:39
To use any commercial application without a proper license is robbery!
If your planning exceeds the maximum possible for the evaluation copy of P3, you could ask someone with a full P3 to split the project in smaller workpackages (not fragnets) that you will open separately.
As a PM instructor, I use a eval copy of P3 and thats the way I am working
Regards
Member for
20 years 6 months
Member for20 years6 months
Submitted by Jaroslava Sedrlova on Mon, 2005-04-18 09:34
Member for
24 years 6 monthsRE: open file
Clarification on some points below:-
Jaroslava Sedrlova wrote:-My friend sent me project in pdf. There is no way to open a pdf as a workable schedule….you will need to get a PRX file…ask for a compressed backup or re-enter the data.
Alexandre Faulx-Briole and Sukumaran Subaramaniyan made good suggestions on breaking up the schedule however be careful.
With Alexandre’s method you will need to review the downstream constraints each time you reschedule one of the sections of the schedule.
With Sukumaran’s method you should break it so the relationships all flow one way ie from project 1 to project 2 then onto project 3 as you can then schedule the project in sequence once and the correct dates will be calculated. The moment you go back to an earlier project you would need to reschedule that project in the correct sequence to get valid dates on all activities.
Hope this helps.
Member for
20 years 8 monthsRE: open file
Ask your friend forward to you the back up PRX file. You do not need to redo the schedule, just restore and work on it.
Check whether the message is still popping out. If yes, you split the schedule to a smaller workpackages and create a project group template.
Using project group template copy the smaller workpackages as a subproject and interlink the related activities. With project group you can manage all the workpackages simultaneously and efficiently. This might help you to solve the problem.
For more info go to help and read through the Project Groups.
Regards.
Member for
22 years 9 monthsRE: open file
Jaroslav,
ask somebody with a full P3 to split your 200 task project in 4 smaller workpackages
the links between them will be replaced by Start Not Earlier Than dates.
This will work fine
Alexandre
Member for
20 years 6 monthsRE: open file
Hi.
I dont think that its my case. The project has less than 200 activities. My friend sent me project in pdf. I can see the result but I cant see information what I need for my bachelor
work.
If anybody can help me I will be very happy.
Have a nice day.
Member for
20 years 9 monthsRE: open file
Another thing is that P3 has limitation for showing activities more than 32000 and it recommends applying filters to select group of activities. Please make sure this is not your case.
Member for
20 years 6 monthsRE: open file
Hi.
Can anybody do it for me, please? Make smaller workpackages?
Will information about precedessor be the same? Actually I need only this information from the file.
Thank you.
My number is 9791.
Member for
22 years 9 monthsRE: open file
To use any commercial application without a proper license is robbery!
If your planning exceeds the maximum possible for the evaluation copy of P3, you could ask someone with a full P3 to split the project in smaller workpackages (not fragnets) that you will open separately.
As a PM instructor, I use a eval copy of P3 and thats the way I am working
Regards
Member for
20 years 6 monthsRE: open file
Hi.
You were right. I need license. I need just open one file. Is there any other chance how I can do it without license?
Anyway. Thank you.
Jarka
Member for
20 years 8 monthsRE: open file
Im using the license copy. My project activities have exceeded 23,000. Hence with the license programme Im having the same problem as Jaroslava.
May be it is an installation problem. If you got the CD try to re-install with full installation.
Regards.
Member for
22 years 7 monthsRE: open file
Hi Jaroslava,
It should be demo version which you are using, hence you have to buy a P3 with license, then you can work well.
Cheers!!!
Daya
Member for
20 years 11 monthsRE: open file
Hi there.
Probably its mere evaluation version of P3.
Member for
22 years 9 monthsRE: open file
Hi,
Do you have a full P3 license or an evaluation copy limited to 60 activity rows?
Alexandre