you can use the Microsoft Project software for basic planning of the different project tasks. You can schedule tasks, allocate them to resources, and if you have the cost of each resource, material etc., then you can track that also, and have a much better comparison of projectd timeline, costs versus actual costs, timelines.
This is an excellent tool, but must be used and updated regularly. Do not use it only in the planning stage. It wiill really bear fruit if you use it during executing of the project, and can save you a lot of time and money, and provide much better control over the project.
Member for
13 years 8 monthsMona,you can use the
Mona,
you can use the Microsoft Project software for basic planning of the different project tasks. You can schedule tasks, allocate them to resources, and if you have the cost of each resource, material etc., then you can track that also, and have a much better comparison of projectd timeline, costs versus actual costs, timelines.
This is an excellent tool, but must be used and updated regularly. Do not use it only in the planning stage. It wiill really bear fruit if you use it during executing of the project, and can save you a lot of time and money, and provide much better control over the project.
Hope this helps - Cheers - Davis.
Member for
24 years 6 monthsI publish a number of books
I publish a number of books on MSP, you may wish to consider buying one of these.
Theyare available in paperback, spiral and eBook format.
Regards
Paul E Harris
BSc Hons, Certified Cost Engineer, PRINCE2 Practitioner
Managing Director and President
Eastwood Harris Pty Ltd, Australia
www.eh.com.au, www.eastwoodharris.com, www.primaskills.com.au and www.primavera.com.au
Project Control Consultants and Planning and scheduling software book and training material publishersRegards
Member for
18 years 9 monthsHi MonaIf your project is
Hi Mona
If your project is scheduled, the first think is to set the baseline.
Ms project has standard report:
Each of the above categories also contains several pre-designed reports. It depends on what is the need of stakeholder to control the project.
Also it contains visual reports which utilises the of the tables within Excel or Visio, and these come in six categories:
Regards