Activity Codes vs WBS

Member for

22 years 6 months

Use what makes you comfortable and gives the best results to your managers and can assist in delivering the project on time, budget and using correct resources.....its a tool......the reality happens on site with quick decisions and hands on experience. I have never heard of a project blamed for been late for using WBS or Codes?

Member for

19 years 1 month

Activity Codes vs. WBS - Which one is easy to delete?



for me, Activity codes is flexible in P3; WBS is easy in P5 (like MSP), but be careful, I think the undo function is not working once you delete a certain WBS in P5..?



I guess Steps is the lowest in the hiarchy of P5, while in P3, you can play and organize your activities using Activity Codes easily.



Roll up and down are both easy in P3 and P5; but sometimes the labeling in P5 got crap! while in P3, just click reorganize now and its fixed! P5 is not!



WBS activity type in P3 (this one - I dont understand to be honest), actuals cannot fix this type of activity! so once you defined a certain activity as WBS type, never change it!

Member for

23 years 6 months

Thanks Eric,



Again, and even more clearly in the articles you referred to, this confirms my understanding of the use of the WBS option in P3.



In summary:



You can use the WBS function for one single breakdown of your work (i.e. Top - Down from project to workpackage). In addition you can supplement your schedule by defining activity codes and assigning the activity code values to your activities which will enable you to create other cross-cuts of your project.



In P5 (or Primavera Enterprise) there are already many more predefined structures available, such as EPS, OBS, WBS, RBS, CBS as well as the availability to use Activity Codes. However, an additional feature in P5, is the possibility to define a hirarchy between different activity codes. This gives you the possibility to create an additional WBS by combining a number of activity codes to use for defining e.g. a client specific WBS as well as your own company’s standard WBS.



Regards,



Patrick

Member for

23 years 6 months

Thanks guys for your feedback on my question. In particular I would like to thank Raviraj for the reference to that article. It confirmed my point of view, and I can use it as a reference to other people...



In regard to the other remarks posted on this thread, it’s clear that there are many personal viewpoints, which are neither right or wrong in their own way. As long as they get the job done succesfully!



Thanks again!

Member for

20 years 2 months

Those were my viewpoints and would prefer to use activity codes against WBS to save time and efforts.





IM VERY VERY SURE YOU WILL SAVE A LOT OF TIME AND EFFORT IN WBS BY USING THE RIGHT TOOL... NOT P3., USE PRIMAVERA P5 INSTEAD.

Member for

18 years 5 months

Hi garcia,



We can discuss this later. Thread was about usage of Activity codes V/s WBS.



Those were my viewpoints and would prefer to use activity codes against WBS to save time and efforts.



If u are asking my viewpoints about scheduling softwares, check this link (similar to yours - U will agree with what I m saying)



http://www.planningplanet.com/forum/forum_post.asp?fid=1&Cat=2&Top=34159



Cheers,



Raviraj

Member for

20 years 2 months

Yes im using P3 before but i consider it an OLD tool and obsolete.



P3 by the way is not a tool for a modern planners. sorry to tell you..

Member for

18 years 5 months

Hi garcia,



If somebody is organising data with activity codes and not by WBS, it doesnt mean that he/she has not broken down the task into activities.



The definition quoted above is bookish (As, books doesn’t refer to acivity codes) and P3, gives you that flexibility to organise the data as per WBS/activity codes.



With the help of activity codes, you can decompose project into sub-projects, phase, subphase, system, location to get more manageable components exactly in a similar fashion as of WBS.



Are u using P3 by the way?



Cheers,



Raviraj A Bhedase

Member for

20 years 2 months

Hi,



WBS - Work Breakdown Structure it is understood to first break down your task into a pieces and then next Organized it. that’s the S.O.P.



Make a research and you will be enlightened

Member for

18 years 5 months

basic question is about usage of Activity codes V/s WBS. Activity codes is also a look alike of WBS but with customised format.



At the time of organizing, one can organise the data with the desired codes with Activity codes.



For WBS, you dont have that flexibility.



So, my advise is that, at the time of preparing program, one should use activity codes, as we start working from a high-level WBS and then detail it further. This will definitely ease out the things. Once the program takes the final shape, then we can start working on WBS and then we may organise as per WBS.



But, point to note is that, activity coding and WBS coding may be the same.



This is my viewpoint. Any suggestions please



Cheers,



Raviraj A Bhedase

Member for

20 years 2 months

hi patrick



you wrote:

I spoke to a collegue about the fact that often one wbs is created in P3 which actually comprises of multiple structures and therefore becomes a beast of a thing...



It becomes a beast!!! if you are not familiar in using WBS. The WBS method of planning is i considered to be adapted as stardard method to track,schedule project in a clear and precise manner. most of the planners that i know is not using WBS in p3 mainly because p3 is not friendly to used such method. I recommend using WBS in Primavera P5.



Back to the topic, in my reseached i never found one of the best and famous planners including the PMI college of scheduling who does not used WBS. becuase WBS is a form of planning strategy that until today not yet superceded.



So , i recommend used WBS in all type of planning..Instead



Good luck




Member for

19 years 1 month

i believe there were lots of views here regarding that subject, use the search engine..