Planning Engineer;Senior planning engineer; deputy planning manager, KME middl3 east , Sharjah 5 star Hotel G+16 and 1000 Villa project with utilities

START Date
Experience Hours (Planning & Scheduling)
14000
Experience Hours (Cost Management)
5100
Experience Hours (Forensic Analysis)
2300

 Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
 Conduct field scoping to clarify scope as required.
 Understand WBS structure, and work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling ,cost estimating and project control.
 Prepare and manage overall master schedule integrating work breakdown structure using scheduling software.
 Understand contractual matter, earn value method, familiar with scope management and change control.
 Coordinate schedule from multiple contractors and incorporate the information gathered into the overall project master schedule.
 Prepare cost estimation and schedule bar chart plan considering all in puts (manpower, equipments and materials) availability, production and construction sequences.
 Develop work method of statement or procedure as required.
 Understand and able to utilize planning tools such as MS excel, Access, MS Project, Primavera, Maximo, SAP and ERP.
 Develop and update resource (manpower and equipment) histogram weekly or monthly as required.
 Evaluate allocation of resources and provide recommendations to maintain required progress.
 Develop and implement plan versus actual progress charts (histograms/S curves). Reports and analyses deviations from plan.
 Track, monitor and forecast progress of all activities and deliverable such as products, engineering documents, fabrication status and construction of all discipline.
 Analyze gaps between the planned and actual progress and highlight the areas of concern which required action of the associate task member.
 Perform probabilistic analysis of completion dates and potential alternatives. Present risk based analysis of most likely completion and expected deviation range.
 Prepare and update three weeks and three months look-ahead schedule that reflect the priority activities
 Liaises with all team leaders and/or members to communicate required completion dates and interface between functional team/operational team and project team.
 Participate all meeting ( i.e schedule review meeting , progress meeting, coordination meeting, constructability review meeting and so on ).