START Date
END Date
December 07 – May 09 Network Rail
Programme Planner
Involved in ‘Thameslink Project’ which is worth £3.6bn: An integrated collection of projects to increase trains passing north-south through central London, with huge developments at Faringdon, Blackfriars, London Bridge stations & Borough Market; with works in all rail disciplines and platform lengthening between Bedford/Peterborough in the north and the south east/Brighton with new power supplies throughout the routes.