FOOD & MANUFACTURING PLANNING EXPERIENCE - UK & South Africa
1987 Dunlop UK High-Pressure Hose Production Plant. Produced and monitored the initial Master Schedule for this multi-disciplined project.
1987-88 Kellogg GB 1M pkt/wk Cereal Production Line. Responsible for the planning of this extension to an existing factory. Artemis 3,500-activity level 3 CPN covering all disciplines and sub-contractors.
1984-85 African Products Enzyme Extraction Project. Responsible for project control of design, construction and commissioning. Cost control, procurement, materials control and expediting of this fast-track project for the separation and refinement of sugars from maize starch.