Ranhill Engineers & Constructors Sdn Bhd Planning Manager

EMPLOYMENT CHRONICLE AND PROFESIONAL EXPERIENCE



1.0      RANHILL ENGINEERS & CONSTRUCTORS SDN BHD

Position Title     :      Chief Planner, Infrastructure. (Oct 2008 until Present)

Senior Planner, Infrastructure (Dec 2003 until Oct 2008)

Position Level     :      Manager.

Duration     :     Dec 2003 - Present



1.1      WORK DESCRIPTION



1.1.1 PROJECT BRIEF – (DESIGN & BUILD OF THE PROPOSED SENAI - PASIR GUDANG - DESARU EXPRESSWAY)

Located at Johor Baharu, total length of the highway 77km dual carriageway comprises of 35 Mainline Bridges, 28 VBCs and 1.7 km long Cable Stayed Bridge Crossing Sg Johor. Total construction cost of 1.058 Billion, original project duration 36 months, extension of time 27 months.



1.1.1.1      JOB RESPONSIBILITY



•     Developed, Monitor, Control & Tracking Overall Master Level 4 ( CTR ) and detail working program with resources and cost loading.

•     Setting out planning procedure for the project.

•     Coordinate, Managing & Monitor Package Planners about 4 nos. running 5 packages namely (Package 1, Package 2, Package 3a, Package 3b & Package 3c).

•     Prepared Coding System for cost control / Work Breakdown Structure/ Interim Payment Schedule / Payment claim / Tender Schedule / Procurement schedule / A Daily, Weekly & Monthly Report / Internal Management’s Report / Overall Progress Monitoring.

•     Jointly prepared the Contracting Plan / Project Cost Report / Application of EOT for main contract / Project Budget.

•     An adviser to the Senior Project Manager on the critical and delay activities and the impact to the main claim.

•     Review & comments application of EOT sub contractors.

•     Analysis Resources / Earn Value (CPI + SPI) / Recovery Plan & Program / Productivity to determine the activity duration.

•     Others work related to planning.



2.0      DRB – HICOM BHD

Position Title     :      PLANNING ENGINEER

Position Level     :      Senior Executive

Duration     :      Aug 2002 - Dec 2003



2.1      WORK DESCRIPTION.



2.1.1      PROJECT BRIEF – ELECTRIFIED DOUBLE TRACK

Double Track From Rawang to Ipoh 177 km, a government project, to build a Railway Track with a total contract value of 2.6 billion and contract duration of 36 months.



2.1.1.1      JOB RESPONSIBILITY

•     Attached to Civil Package.

•     Assist on developing of Baseline Master Program / Updating & Tracking.

•     Monitoring, control and tracking sub contractor program.

•     Assist on preparation of monthly progress report to KTMB / Internal Weekly Progress Report.

•     Assist on the internal & external interface issues.

•     An advisor to project director on the critical and delays activities.

•     Other work related to planning.





3.0      RANHILL CIVIL SDN BHD

Position Title     :      PLANNING ENGINEER / PROJECT COST CONTROL

Position Level     :      Executive

Duration     :      Mar 2001 - Aug 2002



3.1      WORK DESCRIPTION



3.1.1      PROJECT BRIEF (1) – MUAR BY PASS

A government’s project to construct a viaduct continue with the second bridge Muar (Stay Cable) and 13.1 km dual carriageway with total cost of 286 million and contract duration of 35 months.



3.1.1.1     JOB RESPONSIBILITY

•     Developed Master Level 4 ( CTR ) program & Detail working program with budgeted cost / Coding System for cost control / Project Cost Report / Interim Payment Schedule / Tender Schedule / Monthly Progress Report / Detail Progress Monitoring .

•     Jointly prepared the Contracting Plan / Application of EOT for main contract.

•     Review & Comments application of EOT sub contractors.

•     Analysis Resources.

•     Prepared Method Statement.

•     An advisor to Project Manager on critical and delay Activities.

•     Others work related to planning.



3.1.2      PROJECT BRIEF (2) – MRU ( Mercury Removal Unit )

Project located at PETRONAS PENAPISAN MELAKA Contract Value of RM 5,000,000.00.



3.1.2.1      JOB RESPONSIBILITY

•     Short Assignment (2 months)

•     Developed baseline master program.

•     Monitor & tracking subcontractor program.



3.1.3     PROJECT BRIEF (3) - AIMST ( Asean Institute Medicine Science Technology )

Project located at Kuala Muda kedah Contract Value RM 333 Million.



3.1.3.1      JOB RESPONSIBILITY

•     Short Assignment (3 months).

•     Developed Baseline Master Level 4 ( CTR ) Program.

•     Prepared Monthly Progress Report For Client.

•     Others work related to planning.

4.0      HSS INTESYS SDN BHD

Position Title     :      PLANNING ENGINEER / SCHEDULING CONSULTANT.

Position Level     :      Junior Executive

Duration     :      Jun 2000 - Mar 2001





4.1     WORK DESCRIPTION.



4.1.1     COMPANY BRIEF.

HSS Intesys Sdn Bhd was a Sole distributor for Primavera Project Planner software & also provided a consultancy in Planning and Scheduling Services, offers services to organizations who wish to outsource their Project Planners and Schedulers in all construction including oil & gas and project management area.



4.1.2     PROJECT BRIEF (1)

As a consultant service for KLCCB Project team at Bangi, Project Smart School for Precint 9 & 16 and Extension ANNEX Office.



4.1.2.1     JOB RESPONSIBILITY

•     Short Assignment ( Period Of 2 months)

•     Checking, Monitoring, advising, & troubleshoot subcontractors program ( Primavera ver 3.0 ) for Smart School Precint 9 & 16 and Extension Site Office for Putrjaya Holding.

4.1.3     PROJECT BRIEF (2)

As a consultant service for NOVA NUSANTARA SDN BHD for project M&E hospital Lahad Datu & Keninggau Sabah.



4.1.3.1     JOB RESPONSIBILITY

•     Short Assignment ( Period Of 2 months )

•     Giving full hands on training to their planners. (Primavera Ver 3.0)

•     Assist on developing baseline master program.

•     Provide services on planning & scheduling ( Primavera ver 3.0 )



4.1.4     PROJECT BRIEF (3)

STONE & WEBSTER (M) SDN BHD as a Project Management Team for Chemical Plant (Flexsys Chemical Sdn Bhd ) at Gebeng Kuantan (Nov 2000 – March 2001)



4.1.4.1     JOB RESPONSIBILITY

•     Short Assignment ( Period Of 5 months )

•     Provide services on Planning/Scheduling for Construction schedule, Turnover System & Pre Commissioning & Commissioning schedule.

•     Prepared a weekly report / update weekly progress, “S” Curve & Man Power Resources.

•     Support in project meeting, weekly progress & punch list meeting.

•     Advised main contractor on project progress status and report to project manager.

•     Check progress for invoices claim.

•     Review for field work order.



5.0     MAC YS CONSTRUCTION SDN BHD

Position Title     :      SITE ENGINEER

Position Level     :      Junior Executive

Duration     :      Jul 1999 - Jun 2000





5.1     WORK DESCRIPTION.



5.1.1     COMPANY BRIEF.

Mac YS Construction Sdn Bhd is a class “A” contractor and specializing in housing development.

5.1.2     PROJECT BRIEF.

Project At Kuantan Sg Soi, Cost Project of 20 Million, with a 200 units Low Cost, 227 Units Low Medium Cost and 272 Units Medium Cost. In total about 669 units.



5.1.2.1     JOB RESPONSIBILITY

•     Prepared a Baseline Master program & Detail day to day planning activities.

•     Prepared Weekly & Monthly Report to Client

•     Checking Structural Reinforcement.

•     Material Analysis And Controller.

•     Taking Off Quantity.

•     Site Administrative.



6.0     GAS SUPPLY SDN BHD

Position Title     :      SITE SUPERVISOR

Position Level     :      Non-Executive

Duration     :      May 1999 - Jul 1999



WORK DESCRIPTION



6.1     RESPONSIBILITIES

•     Supervising & monitoring gas piping work.

•     Prepared daily / weekly report.