a. Prepared the contratual master programme using Primavera V6.2.1
b. Prepared the detailed list of resouces required for the works.
c. involved in monitoring the same and suggesting the scope of improvements in progress.
d. Identified the bottlenecks and isuues casuing delay to the projcet.