NSCC Project Controls Engineer

A
Amin Sorour 👤 Member for 20 years 4 months

NSCC specialized in design and construction of quay walls (marine work), civil and ground engineering works for sewage treatment plants, tunnels, piling and deep excavations, in addition to Turnkey solutions for basement construction; as a planning and project controls engineer. Responsibility includes: preparation planning and scheduling documents including time schedules and its periodical update, procurement plans, submittal schedules (shop drawings and samples), s-curves, associated cash flow, resource and cost loading. Controlling and monitoring projects progress during construction. Generate earned value reports using separate sheets, Prepare monthly report reflecting work progress on site, Maintain and update records of sites work progress, preparation means and methods for recovery plans as required, Monitor day to day work progress and evaluate daily and weekly reports coming from site mangers; for the following projects;



-     The lagoons, Sama Dubai, Dubai, UAE.

-     Jumeirah Islands Heights Frounds A&B, Dubai, UAE.

-     ADNEC exhibition halls phase 2, Abu Dhabi, UAE

-     Gateway Towers, Palm Jumaira, Dubai, UAE.

-     Al Mmazar Towers, sharja, UAE.

-     UAE University new Campus, Al-Ain, Abu Dhabi, UAE.