Galliford Try (Infrastructure Division) Planner

During the past three years I have been involved with both the pre-construction and construction phases of planning mainly on the rail side of the business. Responsibilities: include:-

•     The development of a compliant tender programmes in line with Clients operational constraints.

•     Ensuring that all operational constraints are met.

•     The identification of the project critical path and free float.

•     The production of resource schedules for direct manpower and supervision.

•     Production of cash flow and resource graphs.

•     Production of tender method statements / work package plans detailing method of work, possession/isolation constraints, contingency measures, interfaces between other parties/members of the public.

•     Production of Tender Outline Health and Safety Plans, Welfare Forms.

Tenders that I have worked on include:

•     Network Rail Overbridges and Underbridges - Between £½m and £4m.

•     Kings Cross Station Platform Y - £15m

•     Water Orton Re-Signalling - £23m

•     Morton Grange Embankment Works – £1m

•     Dalmuir Station DDA Access - £2m

•     Monley and Abney Footbridges - £1m

•     Asbestos Remediation Works (LNW Territory) - £1m

•     Laurencekirk Station - £3m

•     James Street Station – £1m

•     Arriva Trains Wales Passenger Waiting Shelters Project - £750k

•     A1 Allerdene Bridge – Highways Authority – £750k

Live jobs that I have worked on include:

•     Mauldeth Road / Burnage / Gatley and East Didsbury Stations Refurbishment- £4

•     Preston Station Car Park - £8m

•     Rugby Station Ticket Office / Platform Works - £4½m

•     South Wales Platform Extensions (Cardiff to Rhymney Valley) - £4½m

•     James Street Station Entrance Refurbishment - £1m

•     Asbestos Remediation Works For Operational Property - £1m

•     Llanharen Station - £2½m

•     Dantzic and Norwood Road Bridges - £1½m



During this period I have also been involved in the inputting of data into the Network Rail ARMS (Asbestos Risk Management System).