• OZAS Shopping and Entertainment Centre
• Shopping Mall Project– Client and PM by ECE –Germany ;Vilnius (160.000 m²);
• Negotiate terms, drafting of subcontractor contracts, conditions and commercial issues with sub-contractors, development of contract documents, analyze contract general terms and conditions to highlight areas of risk such as ambiguities, conflicts or deviations from the scope of work., make recommendations to the Management on the mitigation of these risks; Claim preparation and submission, Preparation and submission of Payment Certificates to the Client ,Preparation of Major Subcontractor Payment Certificates and checking with contract conditions; Supervision of Cost&Planning Department, Establishment of Document Control System and Supervision of DCC
• Drafting of Design&Built construction contract for Lake Project (FIDIC based), negotiation of contract draft with investors and finalize the contract.
• Shopping Mall Project– Client and PM by ECE –Germany ;Vilnius (160.000 m²);
• Negotiate terms, drafting of subcontractor contracts, conditions and commercial issues with sub-contractors, development of contract documents, analyze contract general terms and conditions to highlight areas of risk such as ambiguities, conflicts or deviations from the scope of work., make recommendations to the Management on the mitigation of these risks; Claim preparation and submission, Preparation and submission of Payment Certificates to the Client ,Preparation of Major Subcontractor Payment Certificates and checking with contract conditions; Supervision of Cost&Planning Department, Establishment of Document Control System and Supervision of DCC
• Drafting of Design&Built construction contract for Lake Project (FIDIC based), negotiation of contract draft with investors and finalize the contract.