Preparing the Project Control portion of the Preliminary Project Scope Statement.
Creating WBS document of the project, based on am/pm methodology (Physical, Functional and Responsibility WBSs)
Construction coordination of the 9th Olefin, including C2 Cracking, MDHD and LDPE plants, Logistics, non-industrial buildings Off-site package.
Updating project reports in all relevant project meetings.
Cooperating to receive all signatures required for Project Closure Report.