Network Rail Project Controls Engineer

•     Management interface between Scope Designers, Project Planners and Delivery Areas.

•     Determine work capacity requirements and facilitate program tracking and reporting.

•     Responsible for Line of Route information located within the WCRM central database (iPCS).

•     Design, develop and implement procedures to ensure project scope and progress are updated and accurate.

•     Use of Primavera P3 to breakdown project scope, enabling transfer of information between database and spread sheets for analysis, reporting and spreading

•     Liase with Project Planners to forecast project spreads; baseline and assist with the production of the WCRM LoR Integrated Plan.

•     Liase with Change Control Manager and provide data for required changes and controls within the data system.