Logikal Planner

Seconded to Honeywell Systems

Heathrow Terminal 5, London - £100 million (Overall T5 project: £4 Billion)

Project Planner/Project Co-ordinator

April 2007 – April 2008



     Project

• Installation, validation and cause and effect testing of the fire detection and alarm system at Heathrow Terminal 5. Included 333 individual fire detection panels



     Duties and Responsibilities

• Created and managed project plans (P3 and MS Project), and reported progress on a monthly basis to the overall Terminal 5 project group.

• Critical Path Analysis – assessed programme impacts and mitigated against slippage of overall programme

• Creation of the project tracker document, including weekly and monthly ‘lookaheads’ for the installation phase of the system.

• Developed KPI’s to build a realistic picture of project progress to report to Project Team.

• Proactively used ‘what If’ analysis, to identify problem areas and solutions the Project Team.

• Assessed Impact of Change on Programme.

• Used Resource loading and Levelling to generate realistic programmes.

• Liaised with construction (AMEC) and pre-commissioning (Sepam) contractors to negotiate site access dates for Honeywell.