Feb ’09 - Present
Assisting with the Prep and Planning of the Outage for Drax Power Station Selby.
Jul ’08 - Feb ’09
Planning and scheduling on the BCU Project on Hartlepool Power Station, Doosan Babcock being the principal contractor to British Energy.