Doosan Babcock Planner

Feb ’09 - Present

Assisting with the Prep and Planning of the Outage for Drax Power Station Selby.



Jul ’08 - Feb ’09

Planning and scheduling on the BCU Project on Hartlepool Power Station, Doosan Babcock being the principal contractor to British Energy.