Most Clients that have a formal project delivery process have specific deliverables required at the end of each stage or phase. The Close Out Check List is merely such a list of required documents to be produced by the project in the last project delivery stage. A flow chart would show any dependencies between the deliverables.
For Close Out you would be looking for
Tech Docs AFC / As-Built handed over
Manuals in place
Maintenance Systems Loaded
Commercial Close Out
H&S Files handed Over etc
On-going support identified etc
This usually all happens with a Project Close Out Report.
Usually just a list of actions that need to be completed at the completion of a contract / project, mind some contract documents may have specificly identified requirements.
The client may issue a list or more usual to be developed by Client / Contractor.
The type of items could be, Issue Close out Report, Issue As Build Drawings, Issue As build Documentation, Issue of Handover Documentation, Material / Financial Reconciliation, Demobilisation of Site, Removal of Surplus Materails etc.
Member for
20 years 5 monthsRE: Project Close Out Flow Chart or Check List
Most Clients that have a formal project delivery process have specific deliverables required at the end of each stage or phase. The Close Out Check List is merely such a list of required documents to be produced by the project in the last project delivery stage. A flow chart would show any dependencies between the deliverables.
For Close Out you would be looking for
Tech Docs AFC / As-Built handed over
Manuals in place
Maintenance Systems Loaded
Commercial Close Out
H&S Files handed Over etc
On-going support identified etc
This usually all happens with a Project Close Out Report.
Member for
21 years 1 monthRE: Project Close Out Flow Chart or Check List
Hi Mohamed
Usually just a list of actions that need to be completed at the completion of a contract / project, mind some contract documents may have specificly identified requirements.
The client may issue a list or more usual to be developed by Client / Contractor.
The type of items could be, Issue Close out Report, Issue As Build Drawings, Issue As build Documentation, Issue of Handover Documentation, Material / Financial Reconciliation, Demobilisation of Site, Removal of Surplus Materails etc.
Regards
John