Site supervision

PROJECT ENGINEER, Fulton Hogan, Eastern Freeway Extension - Melbourne

START Date
END Date

Project Engineer

Fulton Hogan

Eastern Freeway Extension

 

  • Autonomous control of multiple areas of project works including RC structures, fabricated steel, drainage, and a wetlands construction.
  • Budgetary control and day to day coordination of works

Production Planning & Control Engineer, Grandspan Development Corporation, Coal-Fired Power Plant, Fly-over/Bridges, Metro Rail Stations, Commercial Buildings, Storage Tanks

START Date
END Date

• Understanding contractual obligations, project work scope, client requirements and specifications.
• Creating WBS, BOM, estimating required resources and duration, and generating preliminary schedule and cost budget for approval.
• Establishing schedule and cost baselines and performing work performance measurements throughout the project duration.
• Preparing and distributing status reports (Gantt/milestone charts), performance reports and forecasts (S-curves).
• Tracking and controlling shop drawing revisions and material availability and issuances.
• Conducting routine shop walkthrou

Section Engineer - External Works, Consolidated Contractors Company CCC / HOCHTIEF (JV), Rafic Hariri/Beirut International Airport Rehabilitation and Extension

START Date
END Date

Duties include preparing reinforced concrete shop drawings and the related bar bending schedules; designing pre-cast elements for terminal buildings and got Dar Al-Handasah approval; supervising concrete works in Utility Tunnel, Terminal Building New Elevated Arrival/Departure Bridge, infrastructure works related to electrical airfield lighting for the new East and West Runways with their taxiways; supervising turnkey construction of two electrical substations and concertina fencing on top of Boundary Walls; handing over the Elevated Water Tank, Civil Aviation P

Manager /Civil/ UT(Project Management Consultant), RITES Ltd, Construction of Airport Metro Express line for Delhi Metro.

START Date
END Date

July 2008 – May 2010    MANAGER in Airport Line Consultant (ALC)( A Joint venture of OC-PBI-JARTS-   TONICHI-RITES) engaged through RITES LTD, for the Construction of AIRPORT METRO EXPRESS LINE from NEW DELHI to Indira Gandhi International Airport- Dwarka Sec. 21, a prestigious project of Delhi Metro Rail Corporation Ltd of Phase II.

PROJECT ENGINEER / MECHANICAL ENGINEER, PMC - Adani Group, Industrial Project

V
Vishal Jure 👤 Member for 14 years 9 months
START Date
END Date

Project :    Grain handling and storage project of Adani for FCI

Project :    Material Handling System, West port in Mundra,MPSEZ (Mundra Port & Special Economic Zone) Adani   Group(Gujarat)

Responsibilities: