Lead Project Controls, Planning and Scheduling, TNRP, Transport Network Reconstruction Project

START Date
END Date
Experience Hours (Planning & Scheduling)
1800

NDRRA projects for Fitzroy Region in Central Queensland on the TNRP as Senior Scheduler & Projects Controller for repair of roads damaged from 2007 -2012 Cyclones, Floods & major rain events, over 1400 Km’s of roads had to be repaired and or replaced. Involved several major Road contractors. 115 projects planned into P6 database, contract value $1 billion.

Responsible for maintenance & development of program & supporting the Project Controls Manager(PCM) Achievements

Controls Manager, Gryphon Construction LLC., HEAD OFFICE

A
Aly Mahmoud 👤 Member for 22 years 2 months
START Date
END Date

§  Producing estimates for projects in all stages from conceptual planning to fully detailed estimates for the construction phase using Timberline.

§  Planning and controlling construction projects using control tools such as CPM time and resource scheduling using PRIMAVERA, and the Document Management System using Expedition.

Coordinating the projects on-site and off-site resources such as procurement, accounting, etc, to ensure accomplishing the projects most efficiently.

Planning Engineer, Wood Group, Offshore Facilities Maintenance and Upgrading, EPCIP of CPSE Water Injection Extension Phase 2 Project, EPCI of Removal of Redundant Facilities

START Date

Administered job cards in M-Power, prepared baseline (level-3 and level-4 plan, tick sheet, manning requirement, and histogram); monitored progress (P3 and m-Power update, daily / weekly report, MOM, and issue log); anticipated slippages by means of forecast; and analyzed productivity and other statistics for KPI calculation

Planning Engineer, Mustang Engineering, Alternative Bridge Landing Module (ABLM) on the North Rankin A (NRA) platform

START Date
END Date

Prepared level-3 and level-4 (deliverables level) plan by P6 c/w histograms aligned with CTRs and SDS (Supplier Documents Schedule); monitored progress; and interfaced with Transfield Worley as construction contractor

Contract Trainer/Consultant/Implementation/SME, CoreVentus Seminars, Project Controls and Construction Management Training

START Date
END Date
Experience Hours (Planning & Scheduling)
50
Experience Hours (Cost Management)
50
Experience Hours (Forensic Analysis)
50

Provided training in Construction Infrastructure Management to a group of Malaysian Owners, Contractors, and Construction Managers.  Taught construction management from a project controls perspective, showing how to create a planning and scheduling culture within the company and to manage all projects from the schedule.

Forensic Scheduling Team Lead, Arabtec Construction, Meydan Racecourse

START Date
END Date
Experience Hours (Planning & Scheduling)
150
Experience Hours (Cost Management)
150
Experience Hours (Forensic Analysis)
100

Lead forensic team in collecting data to generate an As-Planned vs. As-Built analysis of delays to the Meydan Racecourse in Dubai.  Researched contemporaneous project documents, converted spreadsheet logs into database, cleaned up data to allow full searches, reviewed RFIs, change orders, baseline and update schedules, and time impact analyses.  Developed position on impact events, prepared presentation documents.

Senior Planning engineer, PMC , EPC, Refinery, Pipeline, Greenfield & Brown field,

START Date
END Date

 

  • From March 05, 2011 to till Date – Senior Planning Engineer

Employer Name: PMC Services

Client Name : Takreer (Abu Dhabi Oil Refining Company)

Project Name: PMC services to RRE (Ruwis Refinery Expansion) Project

Location: Abu Dhabi, United Arab Emirates (UAE)