Planner, ESP Asia Pvt.Ltd,Gaytech Engg.Pvt.Ltd.,CODE Engineers Pvt.Ltd, Natural gas compressor Station,Petroleum refinery construction and shut down
Professional Experience(Current) - Mar‘2013 – May’2013
Position: - Planning Engineer
Professional Experience(Current) - Mar‘2013 – May’2013
Position: - Planning Engineer
Professional Experience(Current) - Mar‘2013 – May’2013
Position: - Planning Engineer
Currnetly working as an Assoicate Planner Scheduler at Kellogg Brown & Root (KBR) Energy and Hydro Carbons division (E&C). Previous background using priopetary custom applicaitons software to run construction earned value and percent completes, Exporting actula finish date and physical percent complete to Primavera 6 software. Anaylzed period performances (Weekly & Year to Date) and made recommendations as needed to improve efficiencies on capital projects. Combination of lump sum and time and material accounts.
Quantity Surveyor / Responsible for providing quantity calculations of project items use for billing certificates and estimates quantities needed for the implementation of project especially volume of concrete and weight of steel. Responsible in bar bending scheduling of Bridge, Retaining Wall, Girders, Piles, NJB and other precast structures, and responsible in preparing shop drawings of structures and steel reinforcement detailing using AutoCAD (2D).
Competency Matrix
Project Management, Planning and coordination:
Ü Executing projects in a time bound manner with various project related activities such as Planning, Method Engineering, Construction Supervision, ResourcePlanning and Pre-Construction Activities.
Ü Anchoring on-site construction activities to ensure Completion of project within the time & cost parameters and effective resource utilization to maximize the output.
Deputed to BRAK for the Construction of Airport Project, Libya for the Libyan Government, constructed by Airport Authority of India Ltd., designed by ITALCONSULT Italy, at BRAK, LIBYA, from 1980 to 1981costing 25 million USD, consisting of
§ Construction of main runway 2500mtr x 30mtr
§ Parallel taxiway 960mtr x 30mtr
Trained to HNC building whilst designing houses, agricultural and industrial buildings.
Obtained Planning permission and building warrants, Bills of Quantities, purchasing, site surveying & setting out, Site management and QS duties.
Project Execution, Quantity Surveying, Billing, Planning, Estimation, Monitoring, Drawings, Documentation Control.
Construction Project Management, Preparing Project Reports, Planning, Quantity Surveying, Billing, Estimation, Monitoring, Documentation Control.
Quantity Surveying & Cost management:
•Cost Estimation & Cost control, Contract Management, Procurement Coordination;
•Prepare BOQ recapitulation;
•Prepare Monthly Financial Affairs Report;
•Prepare and Maintain Interim and Final Quantity Books;
•Check the Contractor’s interim and final pay certificates;
•Evaluate unit rates for new items of works;
•Check joint measurements for interim payments;
•Compute final pay quantities;
•Maintain current as-built drawings as the work progresses;
•Maintain progress schedule and cash flow chart;
•Assist in preparation of Variation Orders.