Progress reporting

Project Planner / Technical Assistant, Gama For Trading and Contracting-Cairo, Unilever factory, Cairo Egypt

START Date
END Date

Planning Engineer  & Technical Office Engineer

  1. Creating Time Schedule
  2. Cost Control Reports
  3. Cash Flow
  4. Monthly Payment Certificate
  5. Updating Time Schedule
  6. Monthly Progress Reports
  7. Quantity Surveying

Planning Engineer, Manazel Construction Company, Ashbeliah Housing Project (400 villas)

START Date
END Date
  1. Productivity Report and Monthly update of Actual man hours versus Budget Man-hours
  2. Preparing cash –flow chart and comparing expected expenditure against schedule income.
  3. Comparing actual cost report to the budget cost and projecting the cost at the end of the projects
  4. Total Budget report including direct and indirect cost, Labor, material, equipment and subcontractor.
  5. Material Coordinator & Follow up
  6. Workshop Drawing (Structural)
  7. Quantity Surveying

planning and project control manager, PT. Tripatra Engineers and Constructors, Concept, FEED, Detail Engineering & Procurement Services for Offshore Platform, Pipeline & Onshore Plant

START Date

More than fifteen (15) years experience in Project Management, Construction Management, Project Scheduling, Cost Control and Project Reporting for Engineering Procurement Construction Commissioning Project (EPCC) and Engineering Project. The experience includes: Prepared of Master, Detailed and Integrated EPCC schedules. Prepared of manpower planning for Engineering, Procurement, Construction, and Pre-commissioning / Commissioning. Projected completion dates and monitored progress toward milestones.

Project Controls Analyst, Alutiiq LLC, Diverse military (DoD) projects

START Date
END Date

Alutiiq LLC is a middle-sized project management corporation (general contractor), subsidiary of the Afognak corporation. Projects included diverse control, systems and security facilities and office buildings ($133MM total). DoD clients included Fort Bragg, Fort Lee, Fort Drum, Holloman Air Force Base, Garrison Aberdeen Proving Grounds, Aberdeen BL-2 Lab, etc.

• Regional DoD project oversight, project scheduling and controls with both Primavera P3.1/P5 and MS Project

Lead Project Controls Engineer, Jacobs Engineering Group, Large oil & gas projects

START Date
END Date

• Project controls mgt, Scheduling in Primavera (P5/P3), Cost Mgt., earned value mgt. (EVM), plans, budgets, forecasts, trend analysis, monthly reports, operational project review reports, margin analysis, change mgt., labor and non-labor corrections, strong interaction with engineering leads, etc.

Sr. Project Controls Engineer , Engineering Technical Group (ETG), Many large oil, gas and construction projects

START Date
END Date

• Project Controls Management for multiple large ($10-$45Mil) EPCM, EPC, CM projects (refinery, pipelines, etc.)

• Project Scheduling in Primavera (P6/P5) and MS Project 2007/2003.

• Project Cost Management and Earned Value Management (EVM).

• Project Budgeting, Forecasting, Project Change Management, Pro-Services Estimates.

• Elaborate project financial margin analysis and operational project report data.

Planner/ Scheduler, Descon Engineering Qatar, Onshore Gas Project

START Date
  • Development and Monitoring of L4 Schedule and Package wise schedules.
  • Submitting planning package to client for review and approval.
  • Developing project applicable WBS (work breakdown structure) and project wide activity codes.
  • Resource loading and levelling at EPC level and presenting to management to avoid any future resource crunch.
  • Package wise Resource monitoring for achieving the schedule.
  • Package wise S-Curve Development and Monitoring for entire project.
  • Controlling project schedule by identifying critical path, project interfaces

Senior Planning Engineer, Saudi Oger Limited, Various projects

R
Robin Fodra 👤 Member for 14 years 11 months
START Date
END Date

As a Senior Planning Engineer, I handle Planning Engineers, initiate and plan actions for planning and scheduling works to be done, prepare baseline schedules, maintain schedules, monitor projects and prepare reports of the status of all on-going projects of PPCD to the Top Management of the company, prepare PPCD Division planning and scheduling standards, prepare Earned Value Management Plan and Reports, prepare Manpower Monitoring Management Plan, prepare EOT analysis, and attend meetings, among others.