Project Control Engineer, United Utilities, Various AMP4 Capex & Opex
Project Controller on Various AMP 4 programmes of work including Water and Waste water infrastructure rehabilitatiion and capital projects.
Project Controller on Various AMP 4 programmes of work including Water and Waste water infrastructure rehabilitatiion and capital projects.
Project Manager for 5 civil buildings in a total amount of 40 mil euros
Since 2003 I am a Turnaround Scheduling Engineer & Turnaround Consultant in the Petro- Chemical and Energy sector. Alongside creating execution schedules for medium to large Turnarounds, I am specialized in developing intergrated Plant Shutdown and Startup schedules.
My software of choice is Oracle Primavera Enterprise, since it delivers the required performance and options for projects with more than 50.000 activities.
Senior Planning & Reporting Engineer
TOTAL E&P Nigeria Limited
Company Industry: Exploration and Construction and Production
Job Role/Department: Senior Planning & Reporting Engineer
Portharcourt Nigeria
July 11 - to date
Lead Planner
Nigeria Westminster Dredging & Marine
Warri Delta State, Nigeria
Jan 11 - June 11
Planning Engineer
Technip Abudhabi,
Offshore Associated Gas Proje
- UKCCS Demonstration Competition (Carbon Capture and Storage - FEED).
- London Underground SSL Project Tender.
- Forensic Planning and Delay Analysis (CNI).
- Siemens Mobility Lead Planner - Successful Tender Programme Development and Support.
- High Output System 4, BCS & TRS Acquisition and Comission - LNE and LNW. Principal Project Planning Engineer.
- Lead Planner responsible for maintaining Network Rail LNW S&C Design Programmes and KPIs, (Contractors include: Jacobs, Atkins, Scott Wilson, Arup, Corus).
- Production of fully cost loaded and resource levelled tender programmes.
- Lead on feasibility study; Effectiveness of Time Chainage software (TILOS) within STS.
- Forensic Planning; payment contention against delivery of various PUUK projects.
- Primary Project Planning Engineer. Collation and maintenance of engineering, design, risk mitigation, manufacturing, information technology, financial, and bearer tie trial work-stream data to form a roll-out Management Programme that conformed to a number of different delivery models.