)Planning

Junior Project Planner, TWP Projects, Konkola Copper Mine No. 4 Shaft

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Konkola Copper Mine No. 4 Shaft (Zambia)– Design Project

This project consisted of the Sinking of a twin shaft next to Konkola No. 1 Shaft. The main designing revolved around mid-shaft and bottom-shaft loading. I set up the drawing office detailed schedules so as to meet construction milestones. *Record: Tallest Steel Headgear in 2009 (±80m).

Lead Project Planner, TWP Projects, Impala 18 Shaft Feasibility

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Impala Platinum No. 18 Shaft (RSA)– Bankable Feasibility Study (B.F.S) [Involvement: April 2011 to October 2011]

I was involved in setting up the B.F.S. schedule in coordinating all stakeholders involved in preparing their reports and studies. This also included the setting up of the Forecast schedule and the C.B.E. (Cost Budget Estimate) for the project. The shaft is very similar to Impala 17# however it is going to a depth of ±2km which is slightly deeper, making Impala 18# a larger mine per ton.

Junior Project Planner, TWP Projects, Impala 17 Shaft

S
Sean Lavery 👤 Member for 14 years 6 months
START Date
END Date

Impala Platinum No. 17 Shaft (RSA)- Full E.P.C.M. Project [Involvement: January 2008 to January 2009]

I was involved in the planning of the early works of the project: compromising of the Surface common and complex infrastructure works as well as the preparations for the Pre-Sinking, Slow-sinking and Normal sinking of three shafts (Main, Ventilation and Fridge). *Record: Tallest Steel Headgear in 2009 (±81m).

Senior Planner, Ansaldo Energya, Power Plant 3x127,8 MW

START Date
END Date

Turbo-generator 3x126,7MV with electrical substation (workshop, administration building, post of centralized control with integral system : energy equipments, gas, gas oil, various water system, electrical,  measures and telephony system, supervisory and security system and many other services).

Senior Planner, Systra-RATP, Underground railway

START Date
END Date

9.1 kmof railway comprising 10 underground stations, maintenance workshop, administration building, post of centralized control with integral system (energy equipments, rail, rolling-stock, telephony system, supervisory and security system and many services).

Program Manager, Syngenta Crop Protection AG, Greenfield & Brown field

START Date
END Date

Syngenta Crop Protection, AG. (Basel, Switzerland) — Seeds EAME Program Manager, 4/08 to 07/11

Managing and leading various projects around the EAME regions (Annual budget of investments up to 150 M€).

New Portfolio of project management has been developed, to accelerate the project delivery and efficiency.

Planning Engineer / Project Control Manager., ADAMAC Group of Companies, Port Harcourt, Nigeria., Chevron Okan Upgrade - $10million

START Date
END Date

IV. August 2001– June 2005 Project Control Manager, ADAMAC Group of Companies, Port Harcourt, Nigeria.

Projects Executed:

  1 Chevron  Okan Upgrade - $10million

  2 Shell UQCC Project       - $3.5 million