)Planning

Programme Planner, YMere Wonen, SAP Programme 100% of YMere

START Date
END Date

Programme Planner: During initiation phase, participate in scope definition and structuring sessions, WBS creation and further detailing, determining scope management strategy and designing and creating further tools and templates to be used within the programme for project control and scope management.

During Planning phase, defined schedule model and strategy, drew up guidelines for the creation of component plans and supplier plans.

Project Control Apprentice, Siemens PLC Metals UK, Various / Training

START Date
END Date

I was a part of the first group of dedicated Project Control Apprentices to undertake the apprenticeship which was created in the north east of England between Siemens PLC Metals UK, AMEC, Aker Kvaerner (Now Jacobs), K Home Engineering and Alpha +. The training was provided on the job and also by NETA (North East Training Agencies), Darlington Technical College and Teesside University. 

 

Lead Planner / Scheduler, Siemens VAI Metals Technologies India Pvt. Ltd., Iron and Steel

START Date

As Lead Engineer for a category 1 capital repair of a blast furnace on a site in eastern india, I had to manage and implement various planning techniques at various phases of a job. My involvement on the job was from conception to implementation and through the engineering, procurement and supply phases to demolition and erection during a shutdown.

Environmental Consultant, RPS, Various windfarms

START Date
END Date

Project management of environmental surveys, use of contractors to inform environmental impact assessments for various wind farms to set budgets and timescales.  Use of MS Project and MS Excel to manage timescales and budgets. Recognition and management of environmental and project risks and implementation of mitigation.  

CONSTRUCTION MANAGER, Planner, Estimator / Quantity Surveyor, Suncon (Pty) Ltd, Riverwalk Shopping Centre

START Date
END Date

Riverwalk Shopping Centre

I managed the construction of the first regional multistorey shopping centre in Botswana from the Tendering phase through the construction phase to Final Completion.

The Shopping Centre consisted of a Reinforced Concrete frame for the double storey section with a post tensioned slab.

Project Manager / Planner, J. Brand Ltd., Multiple Power & Data Network Installations

START Date
END Date

Project Manager/Planner. Smaller value, multiple location, simultaneous projects. Encompassing All project activities, form proposals, procurement, planning (activity & resource) and coordination of multiple project locations throughout the UK.

SOX Analyst, Strategic Energy LLC, Internal and External Audit Compliance Projects

START Date

 

Support SOX compliance evidence as part of responding to both internal and external technology audit compliance requests.  Performed gap analysis of existing business processes, assisted in the documentation of new automation process improvements. 

Revised, edited and proofread SOX documentation to reflect latest changes for system migrations and updates, Create/update process flows as required (i.e.