)Planning

Planning Engineer, Alstom Power, Fujairah F2 KA26 2000MW Combined Cycle Power Plant

START Date
END Date

Project Undertaken:

 

2008 - Fujairah Power Plant Project pkg.2 Gas Turbine & Steam Turbine - 2,000 MegaWatts of net power capacity at Danway Engineering (Fujairah U.A.E.) www.danwayllc.com (Client: Alstom Switzerland)

Sr. Scheduler, Abu Dhabi Oil Refinery Company (TAKREER), Ruwais Refinery Expansion

START Date
END Date

Project Undertaken:



2011 - Al Ruwais Refinery Project Expansion pkg.2 at GS Engineering & COnstruction (Abu Dhadi U.A.E.) www.gsconstr.com.kr (Client: TAKREER) $10bn project with crude oil by 417,000 Barrels per day and nearly double its production of transportation fuels; Gasoline, Jet and Diesel. Takreer operates today at 490,000 Barrels per day

Scheduler/ Planner Specialist, "KBR (Kellogg, Brown & Root) Design & Construction", Yanbu Export Refinery Project

START Date

Project Undertaken:



2013 - Yanbu Aramco Sinopec Refinery Project at KBR - Kelloggs Brown & Root - EPC (Yanbu Saudi Arabia) www.yasref.com (client: ARAMCO) 400,000 barrels per day (bpd) of Arabian Heavy crude oil to produce ultra-clean transportation fuels for international

CONSTRUCTION MANAGER, Electro-Mechanical Engineer, Rakaa Tradings Holdings Limited, MSF Pilot Plant 96m3/day, SWCC, Jubail

START Date
END Date

My job scope is being a site project engineer, managing and supervising the company projects, mainly in water desalination plants construction and commissioning, my duties and responsibilities were involved in and not limited to:

civil engineering, derpao, 1) Infrastructure 2) Sewerage Treatment Plant 3) Bridge works 4)Building works

L
LIN IAN 👤 Member for 13 years 5 months
START Date
END Date

Derpao Construction Co Ltd

 

⑴Supervision, installation, maintain in Touliu D/S Electric transformer station construction

⑵Consolidation, decoration, operation, plan in Touliu Feng-Tang new factory construction

⑶ Road expansion and Channel operation in Chiayi

⑷Chiaya County DMV new construction Reconstruction for elementary schools which were damaged by earthquake in Chiayi

Incharge Planning, Olayan Descon Engineering Company, Jubail, KSA, Plant shutdown maintenance; Construction Project Oil & Gas

Z
Zafar Iqbal 👤 Member for 14 years 8 months
START Date

B.Sc Mechanical Engineer from University of Engineering & Technology, Lahore, Pakistan in 1998, First Division with 74.28% marks.

Detailed Planning, Scheduling, Project Monitoring; Worked in EPC Project of Sahara Tank Farm Facilities, EPC Project of Reactor-4 at Sabic Research & Training Center Riyadh, EPC Project Tank Farm Facilities at Chemanol, EPC Piping Work at Sipchem, etc.

Extensive Work Experience of Shutdown Planning in Major Oil Refineries of KSA, Saudi Aramco Shell Refinery (SASREF), Mobil Refinery (SAMREF), Riyadh Refinery, Petro Rabigh R

Deputy Planning Manager, Thermax Ltd, 2 X 150 MW Coal Based Thermal Power Project

START Date
END Date

·         Preparation, Monitoring & Control of master plan in L1 & L2 levels and further developing to L3& L4 level.

·         Planning and co-ordination of activities, such as Civil, Mechanical, Electrical, Instrumentation and Piping. Preparing plan for execution of work based on the master construction schedule along with materials dispatch schedule.

FIELD ENGINEER, JAI HIND PROJECT LTD, PIPELINE CONSTRUCTION

START Date
END Date

·         JaiHind Projects Ltd. (From March’02 to August’06)

 

Construction Engineer:

 

1.      Vijaypur – Kota Gas Pipeline project (Client: GAIL and Consultant: Veco Canada 70 Km   X Ø18”, Ø16”, Ø8”).

2.      Kailaras – Malanpur Gas Pipeline project (Client: GAIL and Consultant: Mecon Ltd.72 Km X Ø12”, Ø6”, Ø4”)