Project Planner, BLACK & VEATCH International, 1.Refurbishments[Design, Supply, Installation, Construction, commissioning and testing] Lane End WTW [3 million Pound starlings],2.Refurbishments[Design, Supply, Installation, Construction, commissioning and

START Date
END Date

Responsibilities discharged   

  • Develop the Schedule, Set up the base line
  • Resource loading, Target setup
  • Coordinate with project team
  • Attain the meeting and follow the guideline and Collect the data from project
  • Monitoring the Sub contractor works and update the Schedule accordingly
  • Update the schedule and analysis the Current float and critical path.
  • Advice the project manager for critical activities and concern cause.
  • Produce Monthly Project Fina

Project Planner, ABB Ltd, 1.Replacement of Wakefield B 132 kV GIS – 15 Million GBP [ Client CE Electric ], 2.Walpole 132 kV GIS, SGT5 and Centrica Bas Bar Extension – 35 Million GBP [ Client National Grid]

START Date

 

Project Planner/Mechanical Engineer

(17 years experience)

 

  • Prepared, maintained and monitored project plans/schedules.
  • Significant skill on Planning Tools [ Primavera P3 version 3.1,Microsoft Project]
  • I got training on Planning Tools P6 and currently working on P6.
  • Performed critical path analyses, earned value analyses, resource leveling.
  • Involved with site planning in terms of programming and progress monitoring.
  • Worked / lia

Trainee Planner / Technical Assistant, QED International, BP Valhall Re-Development

START Date

I am currently being contracted through qedi to work on the BP Valhall Project as a trainee planner/technical assistant.

My duties are;

  • Compiling work packs
  • Communicating and working with the client and engineers
  • Entering jobcard data into GoPlan jobcard system
  • Entering activity codes into P6 then importing them to GoPlan to be attached with jobcards
  • Getting involved with the decision making for coding structures within P6 and GoPlan
  • Compiling weekly histograms/graphs to show progress with

Planning Engineer, N/KOM, Dock Gate Projects, LOR Barge & etc.

START Date

*Experienced in Civil, Road, Building Construction, Ship Building and Marine Works.
*Experienced in Electro-Mechanical for Construction.
*Experienced in Cost and Estimates.
*Experienced in Project Construction Management (using P3/P6) and MS Project.
*Experienced in Safety and Security, Risk Management, Safety and Health regulations and laws pertaining to the workplace environment.
*Experienced in Computer Aide Design (Auto-CAD 2007, WS, Excel).
*Creative, preservative, can work well under pressure.

Planning Engineer, Corus/Tata, Blast Furnace 4 Recovery/Refurb, Various others

START Date
END Date

During my time with Corus I was employed by the Ironworks department as a Planning Engineer, responsible for planning asset maintenance and improvements, following the Corus Asset Management Framework.  Initially I worked on a large-scale refurbishment project of a Blast Furnace, with business requirements later necessitating a move to a ‘live’ operational environment.

 

Mar 2009 – May 2010             Planning Engineer, Corus Strip Products (Granular Coal Injection De

Framework Coordinator = Senior Planning Engineer, John Martin Construction ( Nuttall John Martin >> Bam Nuttall), Construction Management Framework MAC 9 & 10

P
Paul Ross 👤 Member for 23 years
START Date
END Date

Framework Coordinator = Planning Engineer at BAM Nuttall [ Edit ]

Privately Held ; Civil Engineering industry

April 2004 – August 2009 (5 years 5 months)

Senior Planning Engineer, First Engineering UK - part of Babcock, A variety of tenders and site based projects

P
Paul Ross 👤 Member for 23 years
START Date
END Date

Senior Planning Engineer at First Engineering (Now part of babcock) [ Edit ]

Civil Engineering industry

January 2000 – December 2000 (1 year)