etc.

Section Engineer - External Works, Consolidated Contractors Company CCC / HOCHTIEF (JV), Rafic Hariri/Beirut International Airport Rehabilitation and Extension

START Date
END Date

Duties include preparing reinforced concrete shop drawings and the related bar bending schedules; designing pre-cast elements for terminal buildings and got Dar Al-Handasah approval; supervising concrete works in Utility Tunnel, Terminal Building New Elevated Arrival/Departure Bridge, infrastructure works related to electrical airfield lighting for the new East and West Runways with their taxiways; supervising turnkey construction of two electrical substations and concertina fencing on top of Boundary Walls; handing over the Elevated Water Tank, Civil Aviation P

Lead Planner and Buildings Manager, Consolidated Contractors Company CCC / Bechtel (Consortium), Saudi ARAMCO Gas Pipeline Project and SAFCO (Saudi Arabia Fertiliser Co.) 2nd Urea/Ammonia Plant Project - Jubail - Kingdom of Saudi Arabia.

START Date
END Date

Duties include preparing Primavera schedule of works for all related works detailed to Level 3, loaded with budgeted cost; updating schedule of works on weekly basis together with the status of materials; preparing cost control reports after verification of cost codes, comparing with BOQ prices, checking variations; responsible for quality and procurement of all civil permanent material; guided all architecture and civil shop drawings related to 12,000 m².

Deputy Project Manager, Consolidated Contractors Company CCC / SAIPEM-ENI Group (Consortium), Karachaganak Main Works , Power Plant Complex, Temporary Camp and Construction of 13 km Road Projects, Aksai, Kazakhstan

START Date
END Date

Duties include controlling earthworks and civil concrete activities, introducing and monitoring Russian/Kazakh equipment which were an added values in this new area; supervising buildings’ architectural finishes, all electromechanical systems, wall and roof insulated cladding, steel structure and fireproofing activities; overcoming numerous challenges and difficulties in redesignin

Senior Planning & Project Controls Engineer, Consolidated Contractors Company CCC / McConnell Dowell (JV), Baku - Tbilisi - Ceyhan Crude Oil Export Pipeline (BTC) Project, Baku, Azerbaijan. The Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline is to export

START Date
END Date

Duties included preparing Front End Load (FEL) documents in order to mobilise and start work in Pipe Yards and Camps; initiating method statements, risk assessments, and scope and schedule of works; managing CPM Schedule of works for pipe dump yards and camps.

Planning & Programming Officer / Proposal Officer, Energy Company Limited - TAACA (Affiliated company by Energy Resources Development Co. Ltd. – TAACA), Upgrading for SWPH-Pump & Traveling Water Screen at Yanbu, Construction of Infrastructure for Air Defe

START Date
END Date

As aPlanning & Programming Officer, Operations Department

Job Description:

  • Prepare a monthly project management team (PMT) report with incorporating EPC contractor report’s consisting of: Design engineering deliverables list status, Procurement activities information, Construction progress status and planned schedule and forecast, areas of concern, overall manpower deployment status, current construction materials and equipment deployment status, EPC percentage