Delay Analysis
Application Engineer / Planner / Primavera Application / Trainer, Lindner Schmidlin Facade Limited, Aldermanbury Square
Look me up in Link-in if you want to know more about me.
Senior Planning Engineer, Emirates Trading Agency - Power Projects Division, Electrcial Substations
Responsibilities
· Developing project management plan, time and cost schedules in Primavera and MS Projects (Various versions) and preparing contract programs
· Dealing with bank to discuss cash flow and capital arrangement
Senior Consultant, Hill International, Building, high-profile civil engineering, off-shore and transport, Oil & Gas
Haitham is a Civil Engineer with experience in planning and project controls as a main contractor and consultant, providing planning, project and programme management, delay and disruption analysis and claims management services. Haitham has claims experience in Middle East and Africa and has worked on a number of civil engineering, heavy industry, building, oil & gas and offshore disputes.
Haitham has been awarded with the Legal Experience Training Advanced Professional Award in Expert Witness Evidence (LETAPAEWE).
Planning Manager, SIEMENS, 100 Power Transmission & Distribution EPC Projecs
Planning Manager
Doha, Qatar
Company Industry:Construction
Job Role: Management
Highlight:
• Instrumental in planning and controlling end to end project of 160 un-manned/gas insulated Power Transmission Substations and HV Power Cable Circuits worth USD 3.0B.
Key Responsibilities:
• Formulating and implementing planning procedures an
Lead Planner Cum Manager, Al Reyami Interiors, Public Area, Hotels, Restaurants & Office Fit Out.
Al Reyami Group
Projects Involved:Interior Fit Out & MEP works @ Airport Lounges, TDIC’s Crystal Night Club & restaurants, Novotel & Ibis Hotels, Trader Vics, Five Star Hotel at JAL Towers, Bridge Way -Rocco Forte Hotel, Cleveland Clinic, Various Other projects [Restaurants, Offices, and Retail Fit Outs, Health Club].
Responsibilities:
- Arriving trade specific labour productivity rates an
PMO Lead / Senior Planner (EPCC Project), Sazeh Consultant Company, Bid Boland Refinery project
EXPERIENCE
2012 – Present Iran Power & Water Equipment and Services Export Company (SUNIR) Tehran, Iran
1) Transmission Line, Network system & Substation projects, Senior Project Control
Total value of the project is US$300,000,000
(August 2013 – up to present),
List of projects:
Senior Planner, Gannon Dunkerely and Co.Ltd, Construction of Polypropylene Unit in Oil Refinery and Petrochemical ltd.
Current Role: Senior Planner
Responsibilities included but not limited to:
1. Preparing, Updating, Monitoring and Revising Baseline Master and Target Program on Primavera 6 (Macro and Micro level) with complete Cost and Resource Loading.
2. Prepare Procurment Schedule and organize the delivery of materials on site accordings.
3. Prepare Shop drawings and Material Submittal Schedules.
4. Prepare Cash Flow Plan and S-Curve , Current Versus Planned Projections.
PLANNING ENGINEER, Fibrex, al Reef villas
Planning Engineer
Prepared pre-construction and construction phase master and detailed Schedules.
Prepared and maintained the Engineering & Procurement schedules.
Determined the work activities durations and the proper relationships.
Developed and monitored short term (2 weeks) construction schedules.
Monitored and reported the actual progress of the work versus the planned work.
Forensic Planner / Delay Analyst, Schofield Lothian, Multiple Clients
Planning Consultant Schofield Lothian Planning consultant;• Delay analysis for civil contractor on rail signalling upgrade project in South Wales.• Kings Cross Underground Redevelopment (Phase 2)