Claims

PLANNING MANAGER / Chief Planner, CHINA CONSTRUCTION AMERICA [CSCEC], The Baha Mar Development

START Date

CHIEF PLANNER. More than 22 years of construction work experience in Hong Kong, Macau, China, Philippines and Carribean. Had been involved in mostly large-scale infrastructure projects. Areas of focus include project-planning, scheduling & control, development of the comprehensive program/project management plan, earned value management and risk management. Extensive work experienced in Civil Engineering & Infrastructure Projects (i.e.

Company Director, Collins Project Deleivery, UK Civils Multiple

START Date

With over 25years experience in The Heavy Civils & Construction Industry. I have had the benefit of working on some of the very best projects both in the UK and overseas. Starting as a Site Engineer and progressively working up to Project Director I have gained extensive expierence of all aspects of Project Delivery at the highest level having worked on major Highway, Bridges, Rail and Water schemes.

Planning Manager, Al Naboodah Laing O'Rourke, Burj Dubai - Old Town Commercial Island, Dubai

START Date
END Date

During Tender Stage:

  • Establish programme strategies/method of construction
  • Prepare & analyze tender programme.
  • Estimate man power and plant & machinery requirements
  • Estimate formwork / scaffolding requirement
  • Participate in final settlement meetings to put together a competitive tender

During Construction Stage:

  • Manage a team of 5 Planning Engineers and 5 Performance Measuring Engineers
  • Produce a proje

Senior Planning Engineer (directly reporting to the project director), John Laing International, San Stefano grand plaza - Alexandria -Egypt -($350,000,000)

START Date
END Date

gross area of the project 30,000m2)

A total area of 440,000 m2 consisting of three parking floors, one 3-floor shopping mall, 3-floor administration area, six restaurants, ten cinemas, one 1500-persons capacity ballroom, 125 beds Four Seasons hotel, and 10 high-rise residential towers: (A) The West towers towards the sea, consisting of 26 floors including 400 furnished luxury apartments and (B) The East towers consisting of 30 floors with 500 apartments.

Planning Engineer, Parsons De Leuw Cather Overseas Ltd., Dubai Metro, Palm Jumeirah Gateway Bridge, Construction of Interchange 4.0.4.5.4.75,5.5.5 ,Emirates Road Widening, Sheikh Zayed Road Widening, Floating Bridge, Ras Al Khor Improvements, Business Bay

A
Amit Jog 👤 Member for 21 years 8 months
START Date
END Date

Preparing the Time Impact Analysis for Contractors,

Preparing Delay notifications,

Forensic Analysis using different methods like As Planned Impact Analysis, As Build Impact Analysis. Window Analysis

Preparing the Claim Programmes, Reviewing the Claim Programme.

Preparing Claim Documents i.e. Claim write ups organizing the claim in order of events.

Senior Schedule Analyst, Management Counseling Corp, Various

S
Steve Eiden 👤 Member for 21 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
17700
Experience Hours (Cost Management)
4750
Experience Hours (Forensic Analysis)
9000

Began draftiing CPM networks by hand, entering them onto data cards for running the various reports at an IBM mainframe computer facility. Graduated to developing my own schedules by turning the drawings, reading the specifications and making preliminary schedules for sub and genreral contract review. By the late 80's I was ready for a different schedule development model.