All Aspects of Project Controls Development and Delivery

Vice President - Project Controls

START Date
END Date
Experience Hours (Planning & Scheduling)
3000
Experience Hours (Cost Management)
1000
Experience Hours (Forensic Analysis)
2300

Project Controls & Contracts Administration - Head of Department
- Planning & Scheduling
- Process & New Technologies
- Monitoring & Controlling
- Closeout

Planning & Project Controls Manager, Balfour Beatty Sakti, Pondok Indah Mall II – Hotel & Apartment

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
500

Balfour Beatty Sakti

Planning and Project Controls Manager for a joint venture on a 5 star hotel and residence comprising 23 floors and a ballroom and mall connection.  Produced comprehensive construction schedules, resource and cost loading for civils, structural and MEP fit-out and luxurious finishes.  Liaised closely with the client’s direct contractors to integrate their programmes including earned value.

Planning & Project Controls Manager, Balfour Beatty Sakti, Pondok Indah Mall II – Hotel & Apartment

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
500

Balfour Beatty Sakti

Planning and Project Controls Manager for a joint venture on a 5 star hotel and residence comprising 23 floors and a ballroom and mall connection.  Produced comprehensive construction schedules, resource and cost loading for civils, structural and MEP fit-out and luxurious finishes.  Liaised closely with the client’s direct contractors to integrate their programmes including earned value.

Project Controls Engineer, Prime Sources Limited, Okan GGCP Debottlenecking Project; Offshore Construction Installations Program - OCIP III

START Date

- Prepare Level 1 / Level 2 schedules along with Schedule Basis Memorandum at Proposal stage along with project controls execution plan

- Prepare Level 3 / 4 / 5 schedules in Primavera P6 or MS Project along with Schedule Basis Memorandum

- Update schedules & analyze critical paths.

- Set - up progress measurement system with budgets and ensure consistency with project budget

- Measure progress using progress measurement system and prepare progress / productivity reports

- Review and update progress measurement system

Alliance programme manager, UK National Grid, National Grid - Capital Delivery

START Date
END Date
Experience Hours (Planning & Scheduling)
8050

Alliance Programme Manager.
The aim of this role was to set up and implement the programme management processes required for one of National Grid's electricity alliances.

National Planning Manager, UK National Grid, National Grid - Capital Delivery

START Date
END Date
Experience Hours (Planning & Scheduling)
5000

Planning Manager; In this role my responsibility was to set up a planning team to support the "client side" following National Grid's decision to move away from the "Alliance model" This included setting up the planning processs, documenting the policies and resourcing the team

Senior Director of Project Controls, AECOM, EIC Industrial / Process Group

START Date
Experience Hours (Planning & Scheduling)
4600
Experience Hours (Cost Management)
6150

Functional responsibility for technical and department matters for Project Controls execution in four regional technical resource centers in support of domestic and international field projects.  Department work force peaked @ approx.