Project Planner, Ove Arup & Partners, Croxley Rail Link design programme

START Date
END Date
Experience Hours (Planning & Scheduling)
1000

Contract Project Planner for Arup Ltd assisting on the maintenance and development of the Croxley Rail Link design programme for Network Rail and London Underground.  Liaising with designers and engineers from a wide range of disciplines, including Pway, Civils, Highways, Environmental and Safety, and issuing weekly reports to our client Taylor Woodrow.  Also tasked with the development of the Rail Resource programme and the production of various resourced bid programmes in P6 and MS Project as requested.

Assitant Planning Engineer, CSI, Civil and Build Engineering

START Date
Experience Hours (Planning & Scheduling)
1650
Experience Hours (Cost Management)
1650
  •  planning, scheduling and cost management; I developed exceptional managerial, interpersonal, and communications skills.
  • Inaddition to my managerial skills I have the technical knowledge and experience running a team of planning engineers.
  • Tested experience in heavy civil projects including, highways, bridges,buildings and landscaping.
  • I am advanced in Primavera P6 up to recent version.
  • I have strong skills in Microsoft office.
  • Working knowledge of cost loading, resource loading and reporting.

Planner, Balfour Beatty Construction Services UK, Ethane Import Terminal Project

START Date

I am a Project planner currently working on the construction of Propane Storage tank and tank base for Ethane Import Terminal. 

Duties;

Monthly programme uppdates 

Weekly progress schedule

3 Weekly programme

Monthly report

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1,

START Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

The project involves design and construction of 9.5 kilometres long and 3.7 meters pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also includes 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).

Framework Coordinator = Senior Planning Engineer, ASCO Consulting Engineers/CDM Smith, Abu Hamour (Musaimeer) Surface & Ground water Drainage Tunnel Phase 1

START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Forensic Analysis)
1000

Continues Employment contract with ASCO Qatar till present.

Project: Abu Hamour Surface & Ground Water Drainage Tunnel Phase 1, was design and construction of 9.5 kilometre long and 3.7 meter pre-cast segment lined inside diameter, storm water conveyance tunnel. The project also included 24 deep access shafts and their adit-tunnel connections for Qatar Public Work Authority (ASHGHAL).