Coordinate the development and implementation of project Work Breakdown Structures (WBS)andCost Breakdown Structures (CBS). Prepare project progress schedule updates, reviews, monitoring and provide analysis for delays. Prepare key performance indicator charts and provide analysis of construction progress and production. Support the Project Team in the implementation of an integrated enterprise based, cross functional andEPC master schedule program. Perform Critical Path Analysis. Analyze deviations from t
Site planner for Structural, Mechanical and Piping installation’s on a new process plant and open cast Diamond Mine called Venetia Mine. Fast track project with 27000 tons of structural steel and mechanical equipment. Project scheduling software was Prestge Project Planner and Open Plan. Was responsible for controls and progress measurement of steelwork erection. First introduction to use of bar-code technology through RS232 ports to handheld units to control measure of structural steel erection. Responsible for planning of all ranges of mechanical and plate work items installation.