IN
India (AS.IN)
Assistant Planning Engineer, Eversendai Construction pvt. ltd, Gulita Site- Mumbai. Atmosphere Sky Bridge- Kolkata
-
Understand work scope, quantity and familiar with logical sequences in terms of engineering, manufacturing and construction disciplines.
2. Prepare various strategies for all planning activities for projects.
Shanil Gopalakrishnan
Electrical System Design & Site Management of Green & Brown field projects for pharma sector.
Vice President - Project controls & Planning, OBEROI REALTY LTD., oberoi Esquire, Oberoi Eternia, Oberoi Exquiste, Oberoi Previera, oberoi Prisma, Oberoi School
Currently working as Vice President and Head of Project Controls/ Planning for one of India’s top most real estate developer M/s Oberoi Realty Ltd. Based in Mumbai. During my tenure established a dedicated Planning Department, Control processes and overseeing all planning & project control functions as below :
· Establishing & monitoring Corporate and Project level Control systems.
Ajay Rathore
A civil engineer and PMP having expertise in Civil engineering projects including, infrastructure, Buildings, Water and Waste Water infrastructure projects.
Abhishek Phalphale
Arnab Mukherjee
sital mukherjee
Planning Engineer
Construction Project Planner / Senior Planner, Reliance Industries Limited, Network Operation Centre
PRIMARY DUTIES AND RESPONSIBILITIES:
•Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera P6 software.
•Identify the project deliverables, milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system.
Construction Project Planner / Senior Planner, Reliance Industries Limited, Network Operation Centre
PRIMARY DUTIES AND RESPONSIBILITIES:
•Plan and schedule the project by developing a project master schedule in line with the proposal requirements through the application of the primavera P6 software.
•Identify the project deliverables, milestones, and required tasks and targets to determine the staffing requirements, and allotment of available resources to various phases of the project through the project measurement system.
Pagination
- Previous page
- Page 73
- Next page