IN
India (AS.IN)
rocky strongwill
Aroune Selvalingam
Shah. HB
#planningengineer #scheduling #monitoring #MIS, Adani Infra (I) Limited, 5x660 MW Tiroda Thermal Power Project
Employer: Adani Infra (I) Limited
Projects Handled:
5 x 660 MW Thermal Power Plant for Adani Power Maharashtra Ltd.
2 x 660 MW Thermal Power Plant for Adani Power Rajasthan Ltd.
- Key Result Areas:
# Responsible for the preparation of the project schedule (L1-L3) and updating the same at a periodic interval.
#planningengineer #scheduling #monitoring #MIS, Adani Infra (I) Limited, 5x660 MW Tiroda Thermal Power Project
Employer: Adani Infra (I) Limited
Projects Handled:
5 x 660 MW Thermal Power Plant for Adani Power Maharashtra Ltd.
2 x 660 MW Thermal Power Plant for Adani Power Rajasthan Ltd.
- Key Result Areas:
# Responsible for the preparation of the project schedule (L1-L3) and updating the same at a periodic interval.
Saikat Sen
An experienced, organised and highly respected Project Planner Manager who has gained vast experience across all levels including construction, schedule and cost management,project and milestone reporting and robust resource planning in the railway sector A drive professional who has played a pivotal role in multiple international railwaycivil engineering and construction projects where stringent control has been delivered against all schedules, timescales and milestones.
Civil Site Engineer, Suraj Kumar & Company, Buildings
• Carried out the periodic reviewing & monitoring the project progress with client and ensured the completion of project within the scheduled time and cost parameters. • Handled the bill preparation and checked Monthly Bill of Subcontractors.
Civil Site Engineer, Biswas Engineering, Buildings
• Handled the preparation of daily & monthly progress report.
• Developed & reviewed the project planning & progressing.
• Reviewed the drawings, specifications and BOQ for speedy completion of work.
Site Engineer, B E Billimoria & Company Limited, Residential Towers
• Carried out the quantity surveying works and monitored the execution of construction works. • Planned the daily works & responsible for client interactions. • Handled the sub-contractor bill preparation and checked Monthly Bill of subcontractors
Pagination
- Previous page
- Page 5
- Next page