L&T Planner
Current Role
IN
Current Role
• Strategic Location Analysis
• Master Schedule preparation and control
• Pre-Budget approvals and post Cost / CWIP control.
• Documentation control and Project Close Out procedures.
• Control of site works for utility & facility installations of over 50 major contracts.
• Board strategy approval backup calculations for cost and time.
• All project stage gate controls as per BP Standards.
• Enforcing HSSE adherence as per BP standards.
• Handling Claims from Insurance.
Handling of Individual projects which required leading a project team, monitoring expertise in assembly, testing and commissioning;
Project Procurement & Planning;
Billing and office procedures according to ISO;
Implemented engineering level changes by coordinating with erection and commissioning team;
Provided regular customer support by regular organized meetings with the clients regarding the progress of the projects;
Assess, analyze and prepare relevant documents for participating in tenders in consultation with the management.
Estimation of quantities and procurement of materials.
Preparation of Architectural drawing Auto cad software.
Preparing the project planning schedule & updating it at the regular periods.
Checking the site to prepare the As-Built drawings using Autocad.
Current Role
Project Planning, Project Monitoring & Control, Contractual Claims, Management Reports, Presentations