A competent professional with 6+years of rich experience in the areas of Construction, Project Controls, Project Cost Estimation, Budgeting & Control & Earned Value Management. Presently serving Institute for Plasma Research, Ahmedabad, as a Engineer (Planning & Scheduling).

Engineer (Planning & Scheduling), ITER-India, IPR, DAE, Govt.of India, ITER International Fusion Reactor Project

M
Malay Vora 👤 Member for 14 years 11 months
START Date

 

Prepare WORK BREAKDOWN STRUCTURES (WBS) & initial network of activities in consultation with Subject Matter Experts (SMEs) for project programme in Primavera P6.

Prepare master/baseline schedule for the project & and review the schedule submitted in the bid and prepare the detailed baseline schedule (L1 to L4) during design and construction stages for the project. 

Preparing weekly and monthly progress reports based on data captured during execution on weekly/monthly basis.

Manager (Planning & Scheduling), Reliance Industries Limited, Jamnagar Export Refinery project

M
Malay Vora 👤 Member for 14 years 11 months
START Date
END Date

 

Prepare WORK BREAKDOWN STRUCTURES (WBS) for the project & initial network of activities in consultation with Subject Matter Experts (SMEs) for the project programme in Primavera 

Prepare master/baseline schedule for the project & and review the schedule submitted in the bid and prepare the detailed baseline schedule (L1 to L4) during design and construction stages for the project. 

Preparing weekly and monthly progress reports based on data captured during execution on weekly/monthly basis.

K L KAMESWARI AKONDI

First Name
K L KAMESWARI
Last Name
AKONDI
Professional Since
Oldest experience
Years Experience
43
Telephone Number
9686835721
LinkedIn Profile

Primavera Software:My comapny has given a training in Primavera Software.We can create a Unlimited baseline in Primavera.I worked in 2X685 MW Super critical Power Plant.Every Month Contractor is sending the Primavera File to us.I am uplloading the document in Primavera and assigning the Baseline to it and then i will update Schedule and Tracking the schedule ,identifying the Critical path

MS Project:It is the Basic tool before learning the Primavera.In my project Package(WTP, RWI,CHP,AHP ) vendors submitting schedule through MSP only.So every month i am updating the small

Junior Manager, GMR Energy Ltd, 2x685 MW Super Critical power Plant

START Date

Project:

  • GMR Chhattisgarh Energy Limited, Raipur is a 2x685 MW Thermal Power Plant located near Raikheda, Chhattisgarh.

 

Job responsibilities:

  • Developed an Excel based Monitoring sheet for Engineering, Procurement and Construction for generating the S-curves.

 

  • Preparation, Updating of L2 Schedule Plan of Various Packages in Primavera(P6 version).

 

  • MIS report generation to the top management & Preparation of Project progress S-c

Planner & Senior Planner, Dongre Associates baroda, EPC construction of commertial towers at Gandhinagar for GIFT-Gujarath India

START Date
END Date

As a planning engineer monitoring for 2 numbers, 30 storied  commertial towers  for PMC.

In respect of Daily, Weelkly & Monthly Reports.

Planner & Senior Planner, Dongre Associates baroda, EPC construction of commertial towers at Gandhinagar for GIFT-Gujarath India

START Date
END Date

As a planning engineer monitoring for 2 numbers, 30 storied  commertial towers  for PMC.

In respect of Daily, Weelkly & Monthly Reports.

Planner & Senior Planner, Dongre Associates baroda, EPC construction of commertial towers at Gandhinagar for GIFT-Gujarath India

START Date
END Date

As a planning engineer monitoring for 2 numbers, 30 storied  commertial towers  for PMC.

In respect of Daily, Weelkly & Monthly Reports.

Graduate Site Engineer, Kunnel Engineers and Contractors, Pine Wood Towers

START Date
END Date

 

Graduate Site Engineer                             June 01 – February 02

Kunnel Engineers and Contractors Pvt Ltd, Cochin, Kerala, India

 

·   Re-measurement of work done and assessing progress.

·   Maintenance of files and records in compliance with ISO standards.

PLANNING ENGINEER, Ssangyong-Oriental Joint Venture, 4 Lane & Bye Pass National Highway No. 03 Indore section, India

START Date
END Date

Duties & Responsibilities

  • Prepare construction schedule for construction of 4 lane Flexible and Rigid pavement and Bridge over River Shhipra,
  • Monitoring – progress reporting of construction of 4 lane Flexible and Rigid pavement and Bridge over River Shhipra,
  • Prepare of Gantt bar chart showing progress,
  • Prepare quantity execution schedule,
  • Prepare resource Schedule,
  • Prepare S-curve for financial planning,
  • Prepare progress reports,
  • Participating to progress and ad hoc project meetings keeping infor