India (AS.IN)

IN

Project Control & Planning, Alkhorayef Group of Company, New GC-16 in West kuwait

START Date

v  Experience in Detailed Engineering Coordination activities for OIL & GAS, Petrochemicals Industries.

v  Expertise in conducting & coordinating project activities, estimation & costing, tender evaluation & contract management with a flair for adopting modern methodologies.

v  Good experience in Reviewing Documents and Separating the Client Comments forwarding to Sub contractors.

Girish Bhave

First Name
Girish
Last Name
Bhave
Professional Since
Oldest experience
Years Experience
43
Telephone Number
+ 918800592471
LinkedIn Profile
http://www.linkedin.com/profile/view?id=29759327&trk=nav_responsive_tab_profile

Schedule Analyser supporting Claim Management:

  • Prepare delay analysis, schedule impacts due to unexceptional/force majeure events, variation orders to support Extension of Time (EOT) claims.
  • Demonstrated delay analysis techniques like TIA, ABBF & Window Analysis.

Project Planning/Scheduling:

Scheduler Manager, Samsung C & T, 4000 MW combined cycle power project

START Date

Summary of Professional Skills

 

Scheduler / Schedule Coordinator:

  • Involved in revising L3 level of EPC project schedule in primavera P6 based on the contractual milestones. Revising WBS, Activity Codes & sequencing of activity as per the present site condition and material delivery status.

Product Engineer, KLG Systel Limited, Multi Projects

START Date
END Date

•Worked with Primavera Project Planner for Enterprise P3e/c 5.0 Software for Implementing the Product to Various clients.
•Setup the Primavera Software to Client as per the Corporate & Project requirements such as Standalone Installation & Concurrent Type Installation, Formatting Units, Dates, Currency, Profile, Calculation, filter, Group & Sort Setup.
•Implementation of Primavera P3e 5.0 setup as per corporate project Setup requirement by client such as Structure the EPS, OBS, User defined, Calendar, Project Codes, Creating Resource & Role Master data, Resource codes, Budget estimation.
•I

Product Engineer, KLG Systel Limited, Multi Projects

START Date
END Date

•Worked with Primavera Project Planner for Enterprise P3e/c 5.0 Software for Implementing the Product to Various clients. •Setup the Primavera Software to Client as per the Corporate & Project requirements such as Standalone Installation & Concurrent Type Installation, Formatting Units, Dates, Currency, Profile, Calculation, filter, Group & Sort Setup.