Bangladesh (AS.BD)

BD

Sazibul Islam

First Name
Sazibul
Last Name
Islam
Professional Since
Oldest experience
Years Experience
43

As A Site Engineer I worked In ABRAR Dot's and Development Ltd.

Unemployed, N/A, N/A

START Date
END Date

This is my unemployed period, due to my marriage purpose.

I had resigned from my ex employer Dodsal in its Algeria project as my marriage was fixed and I am not getting more than 1 month leave. To take a longer time period (3~4 months) I was advised to take resignation. Hence I had submitted my resignation to Dodsal HR & returned to my home country Bangladesh on Dec, 2009. From that time till 19th June, 2010 I was unemployed and stayed in home. I joined 2Yokogawa Middle East Co. BSC, Abudhabi on 20th June, 2010. Till then I am working with Yokogawa in Abudhabi location.

PLANNER, dfgj, TUNNEL,

START Date
END Date

Construction Scheduling Consultants is provided by Precision Scheduling Consultants ,LLC. There are some activities by PSC as

1.Construction schedule Development.

2.schedule updating.

3.Schedule monitoring & construction oversight.

4.MIS development

5.Cost loading.

6.Resource loading etc.

Bid/Project Planning Engineer, TTJ Design & Engineering Pte Ltd, Lanxess, SLNG

M
Masud Zaman 👤 Member for 14 years 8 months
START Date

Career Summary:

I am an enthusiastic and determined professional with solid background in project planning, scheduling, monitoring and control. Experience for large industrial projects (Process plants), MRT Stations/tunnels, cement plant, garments manufacturing factory, power plant, rubber plant, petrochemicals and oil & energy projects.

 

Current goal is to enhancement of enterprise project management skills with a focus on business decision support systems, projects analytics and risk management for projects.

Engineer (Mechanical Maintenance), Bangladesh, “Sunman Textile Mills Ltd.”, Maintenance Works in this Composite Textile Mill

START Date
END Date

 

I had worked in “Sunman Textile Mills Ltd.”, Bangladesh from January 01, 2004 to October 31, 2004 as an Engineer (Mechanical Maintenance). I had worked as a maintenance engineer in this composite textile mill. I worked in its maintenance section of Spinning, Dying and Weaving mills.

1.      Reporting for maintenance works to Supervisors.

2.      Supervision of Periodic Maintenance Works.

Assistant Engineer (Planning & Operation), Bangladeshat, “KYCR Coil Industries Ltd”, Operation Process for Cold Rolled Coil preparation

START Date
END Date

 

I had worked in “KYCR Coil Industries Ltd”, Bangladeshat November 01, 2004 and worked as an Assistant Engineer (Operation) until September 01, 2005. The main business of this company is to produce Cold rolled coils & sheets.

My main objective was to operate the 6 Hi HS-CVC Cold rolling mills (POR, ETR & DTR).

1.      Operating POR, ETR & DTR: Operating the three positions of main Rolling mill.