Azerbaijan (AS.AZ)

AZ

Civil construction planning engineer, Telcoplus, BP BV Electrification

START Date
END Date

i have been in a project of BP BV Electrification project.

i was planning the project, updating, tracking progress, making dashboards indicating the status of the works and etc.

The scope summary is: to construct 100 km electrical for Block Valves through the territory of Azerbaijan. 

Turnaround Planning Lead, BP AzSPU, Azerbaijan Delivery Unit (BP)

START Date

Turnaround Planning Lead for the Azerbaijan Offshore SPu of BP. Delivering all levels of plans and schedules for the delivery of Platform Turnarounds in the Caspian Sea region off Azerbaijan. Developing reporting and monitoring systems to BP International Standards

Senior Planning & Project Controls Engineer, Consolidated Contractors Company CCC / McConnell Dowell (JV), Baku - Tbilisi - Ceyhan Crude Oil Export Pipeline (BTC) Project, Baku, Azerbaijan. The Baku - Tbilisi - Ceyhan (BTC) Crude Oil Pipeline is to export

START Date
END Date

Duties included preparing Front End Load (FEL) documents in order to mobilise and start work in Pipe Yards and Camps; initiating method statements, risk assessments, and scope and schedule of works; managing CPM Schedule of works for pipe dump yards and camps.

Planning & Controls Engineer, "Tekfen Construction and Installation Co., Inc.", Sangachal Terminal Expansion Project

S
Safak Vural 👤 Member for 18 years 1 month
START Date
END Date
  • Preparation of  New Construction Schedules (Total Man-hours = 932.000)
  • Revising Existing Construction Schedules (Total Man-hours = 1.986.000 )
  • Updating Construction Schedules.
  • Official Correspondence with Client
  • Overall control over DC activities
  • Preparation of Daily, Weekly and Monthly Reports
  • Preparation of Bill of Quantities
  • Control of Personnel Time Recording Database
  • Supporting Preparation of Budget
  • Supporting Preparation of Payment Certificates
  • Responsible for Tender Prepara

Safak Vural

S
Safak Vural 👤 Member for 18 years 1 month
First Name
Safak
Last Name
Vural
Professional Since
Oldest experience
Years Experience
11
Guild Accreditation
GPC Member

Education & Qualifications

Bogazici University,

Bebek, Istanbul TURKEY

B.Sc. in Civil Enginnering, 2005

BIO

Project Planner, BP, NOP

S
Safak Vural 👤 Member for 18 years 1 month
START Date
    • Develop the Project Planning/Scheduling Controls strategy, plans and procedures, reflecting both BP, (JV) and contractor roles and responsibilities.
    • Provide the necessary schedules to ensure the development of proper estimates and studies within a project stage and for sanction.
    • Coordinate and/or develop appropriate internal and external schedule benchmarks/technical limits.
    • Prepare and implement project wide WBS/CBS, working with the Cost Engineer
    • Ensure the preparation and development of appropriate detail and summary project cont

Shamkhal Ragib

First Name
Shamkhal
Last Name
Ragib
Professional Since
Years Experience
0
Telephone Number
+994554319617
LinkedIn Profile
https://www.linkedin.com/profile/view?id=89002456&trk=nav_responsive_tab_profile_pic

Planning and Scheduling of OIL&GAS Platform, BP AzSPU, West Azeri Platform Area Scheduler

START Date

Planning and Scheduling of OIL&GAS Platform

Offshore Operations Support Coordinator at BP

Offshore Material Supervisor/ Logistic & Procurement Department at RBG Group

Contracts Administrator at PCH Offshore PTY LTD