Senior Planner, Projects Group, BHP Mitsubishi Alliance (BMA), Various

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

BHP Billiton, Mitsubishi Alliance (BMA) Australia (Apr 2012 – AUG2012)

Senior Planner, Projects Group

  • Responsible for development of the various study schedules encompassing Identification, Selection & Definition phases.
  • Provided detailed input to the development of a revised planning methodology for studies undertaken with BMA.
  • Performed the role of project controls lead for BMA accommodation projects.  

Senior Scheduler/Planner – Environmental, Statutory Approvals & Stakeholder Sub-Project, Orario Services Pty Ltd, APLNG Coal Seam Gas Brisbane

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

APLNG Coal Seam Gas Brisbane, Australia (Apr 2011 – Apr 2012) Scheduler/Planner – Environmental, Statutory Approvals & Stakeholder Sub-Project

  • Responsible for development of the level 4 schedule encompassing the statutory and regulatory permit and approval process.
  • Directed the design and implementation of a fully integrated program of schedules encompassing the requirements of design packages and land access liaison with 3 levels of government and local land owners to facilitate property access and environ

Lead Scheduler/Planner – Engineering, SKM, Vale Carajas S11D Iron Ore Project

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

Vale Carajas S11D Iron Ore Project Brisbane, Australia (Nov 2010 – Apr 2011) Lead Scheduler/Planner – Engineering (SKM)

  • Responsible for leading the development of the level 4 resource loaded design schedule
  • Responsible for development of the master EPCM schedule, & the development of a schedule methodology to allow the effective use of the EMR progress measurement toolset

Principal Scheduler/Planner - Engineering, QCLNG , QCLNG Export and Collection Header Pipeline Project Brisbane, Australia

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

QCLNG Export and Collection Header Pipeline Project Brisbane, Australia (Jun 2010 – Oct 2010) Principal Scheduler/Planner - Engineering

  • Responsible for leading the development of the detailed resource loaded detailed design schedule
  • Responsible for the integration of the detailed engineering schedule into the master EPC schedule, and the development of a schedule methodology to allow use of the Integrated Project Management System (IPMS) engineering progress module
  • Responsible for ongoing Pertmaster schedu

Project Controls Lead , Coombabah & Stapylton Project Alliance, Coombabah & Stapylton Project Alliance

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

Coombabah & Stapylton Project Alliance Gold Coast, Australia (Apr 2009 – Jul 2010) Project Controls Lead

  • Responsible for leading development of the detailed resource loaded detailed design schedule
  • Champion for the development of Prism engineering progress module, and definition of Integrated Project Management System (IPMS) document control module
  • Responsible to lead the handover of the developed project controls system to the project team
  • Responsible for ongoing Pertmaster schedule ri

Project Controls Lead , Coal Connect Alliance, Coal Connect Alliance

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

CoalConnect Alliance Brisbane, Australia (Mar 2008 – Mar 2009) Project Controls Lead

  • Coordinated a range of tasks, including; supervision of the project controls team; development and ongoing management of the alliance delivery program, including baseline establishment; cost management and forecasting of the immediate design services leading to the development of the alliance TOC estimate;
  • Preparation and co-ordination of the Quarterly EAC; integration with Queensland Rail project controls system; status collection

Project Planner/Scheduler, Kestrel Mine, Kestrel Mine Extension Project Brisbane, Australia

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

Kestrel Mine Extension Project Brisbane, Australia (Nov 2007 – Feb 2008) Project Planner/Scheduler

  • Participated in definition and development of the detailed resource loaded EPCM schedule; including baseline establishment; cost management and forecasting of the engineering design services
  • Integration of procurement system information into master schedule, to provide analysis capability between design development and procurement package preparation, leading to issue of RFT’s

Andrew Dick

A
Andrew Dick 👤 Member for 19 years 4 months
First Name
Andrew
Last Name
Dick
Professional Since
Oldest experience
Years Experience
11
Telephone Number
+12812172954
LinkedIn Profile
www.linkedin.com/in/andrewdick2

Summary of Experience

Senior Scheduling Professional, Boeing Australia, ADF High Frequency Modernisation Program (JP2043) Brisbane, Australia

A
Andrew Dick 👤 Member for 19 years 4 months
START Date
END Date

ADF High Frequency Modernisation Program (JP2043) Brisbane, Australia (Jan 2004 – Jan 2007) Senior Scheduling Professional

  • Responsible for the operation, maintenance and oversight of the project master schedule with primary responsibility for overall schedule integrity; schedule establishment; baseline maintenance; critical path analysis; and identification of potential issues and impacts
  • Providing coverage for the Project Controls Manager during leave of absence; preparation and co-ordination of the Quarterly EAC;