10 years of planning and scheduling experience in construction, EPCC projects and railcar manufacturing. Currently working as scheduling engineer in a railcar manufacturing industry.
Rizwan Siddiqi started his career as a software developer and gradually moved into IT project management for deployments spanning complete SDLC phases using Agile and Waterfall methodologies. He has also managed product deployment projects that involved client process re-engineering.
Recently, Rizwan Siddiqi gained invaluable project management experience out of his comfort zone when the consulting company he currently works for engaged him on multiple non-IT related projects involving complex project plans managing research and deployment type activities.
I am a top-performing professional with solid work ethic and nearly 15 years of experience in Critical Path Method (CPM) planning and scheduling. Broad background supporting complex construction projects with tens of thousands of activities and budgets as high as $4.4B. Well-regarded project control engineer with exceptional technical acumen and track record of success improving efficiency and ensuring on-time completion via expert utilization of technology.
Prepared, monitored, analyzed and reported on CPM Schedules ($190 million in school construction projects and $17 million in a retail shopping center) using Primavera (P3)software. Prepared and distributed CPM Narrative Reports. Generated hand-drawn logic diagrams. Prepared As-Planned vs. As-Built Schedule Analysis, Charts and Graphics. Assisted in the generation of Schedule and Cost Impact Analysis Report for various clients.
Prepared baseline schedule, monitored, analized and repoerted on a cost/resource loaded CPM schedule using SureTrak 3.1 for Iroquois Gas Transmission System. Prepared As-Planned vs. As-Built Schedule Analysis, charts and graphics.
Responsible for the integration of P6 to EcoSys EPC, administration of the Earned Value tool, reviewing the quality of the P6 schedule data being imported into EPC, configuration control of P6 to enable various EPC EV reports.
Responsible for maintaining security within a P6 database that is shared with consortium partners, performing FOAK efforts within the database, creating and modifying global changes, implementing large scale changes to activity details using SDK files, providing technical support to end users, and testing the features and functionality of the