Saudi Arabia (AS.SA)

SA

Lead Scheduler, Strukton International Riyadh, Riyadh Metro Project Line 6

S
SK Chong 👤 Member for 25 years 4 months
START Date
Experience Hours (Planning & Scheduling)
2850
Experience Hours (Forensic Analysis)
300

Lead Scheduler (9 Jul 15 - current)

FAST Riyadh Metro Project

Saudi Arabia

1. Worked with the Project Control Manager on what are required for the control of the project in term of scheduling, monitoring and reporting to client for the line under our control.  

2. Liaise with the Project Management Office as what are the overall project requirements and obligations to the client so that my team can be in alignment to the needs.

Project Planner, ANABEEB, TASNEE Turnaround 2014

START Date
Experience Hours (Planning & Scheduling)
6450
Experience Hours (Cost Management)
1050

Ø  Understand work scope, quantity and familiar with logical sequences in terms of engineering maintenance.

Ø  Conduct field scoping to clarify scope as required.

Ø  Understand WBS structure, and work with management and project/maintenance team in the development of work break down structure for progress measurement, scheduling, cost estimating and project control.

Site Planning Engineer, Atkins Faithful & Gould, New King Abdulaziz International Airport Development Project

START Date
END Date

·        Preparation of a comprehensive cost and resource loaded contract baseline time schedule for the Aprons, Taxiways, Load Centers, Airside Storm water network (Pipe and box culverts), Blue Water Network, Airfield Ground Lighting network and the associated Vault Rooms, Glycol Network, 400Hz Network, Fuel Hydrant Network from the Fuel Farm, Fuel supply network from Aramco depot, GSE Tunnel/Ramps and security checkpoints, by reading the design drawings (70%).

Planning Engineer, Almobty Contracting Company., Dml-2 (Doubling Main line -2 )

START Date
END Date

· Preparing of Basic Contract Schedule & Integrate schedules from engineering,procurement, subcontractors to create Master Schedule· Interface with Engineering and Procurement to quantify assumptions and align Activities.· Break activities into smaller weighted steps and track the completion of the steps todetermine the activity percent complete· Assign resources to activities to admeasure & generate distribution curves toaccurately reflect how the work is performed

Planning Engineer, Almobty Contracting Company., Dml-2 (Doubling Main line -2 )

START Date
END Date

· Preparing of Basic Contract Schedule & Integrate schedules from engineering,procurement, subcontractors to create Master Schedule· Interface with Engineering and Procurement to quantify assumptions and align Activities.· Break activities into smaller weighted steps and track the completion of the steps todetermine the activity percent complete· Assign resources to activities to admeasure & generate distribution curves toaccurately reflect how the work is performed

Sr. Quantity Surveyor & Planner/Scheduler, King Faisal Specialist Hospital & Research Center, Programs and Primavera System Implementation

START Date
END Date
Experience Hours (Planning & Scheduling)
1250
Experience Hours (Cost Management)
1800
Experience Hours (Forensic Analysis)
500

·         Manage EPPM system implementation to pilot projects and assume the role of Primavera Unifier System Administrator and Primavera P6 EPPM 15.2 Super Administrator. Set up new projects, business processes, project document folder structure, assign project teams and manage user access and privileges in the Enterprise Project Management Solution.

Schedule Engineer, Saudi Aramco thru Al-Jehat Trading, 1) Infrastructure 2) Sewerage Treatment Plant 3) Building works

START Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
400
  • Review and comment on work schedule prepared by the contractor and report findings to Project Engineer.
  • Review and comment on other planning/progress related reports submitted by contractor including progress invoice.
  • Monitor work schedule and status, ensuring progress reported is a true reflection of work achieved and report areas of concern to Project Engineer.
  • Attend any relevant planning meetings with Project Engineer and Contractor.
  • Scrutinize in detail the contractor work schedule in relation to logics, critical paths, floats and lags and make any

Project and Portfolio Management Consultant, Buro Happold, Storm Water Drainage Project (RCC Pipeline)

START Date

t was clear from the offset that a different strategy would need to be developed in Saudi Arabia to bring 21 Projects in align with Western Standards and getting the Project online. After screening all the Schedules I was able to identify 10 Disciplines that almost all the Schedules were missing and develop a scoring mechanism to score each Schedule.

Planning Engineer, Nasser S Al Hajri Co Ltd, (various projects)

V
VINOD KUMAR 👤 Member for 12 years 3 months
START Date
END Date
Experience Hours (Planning & Scheduling)
8500
Experience Hours (Cost Management)
600
Experience Hours (Forensic Analysis)
400

Schedule Preparation, Progress Monitoring, Preparation of Histograms, Coordination with construction, S Curve Preparation, Preparation of Monthly and Weekly Construction reports