KW
Kuwait (AS.KW)
ahmed abdelkarim
Area Planning Engineer, International Master, hospital-
Senior Planning Engineer
§Preparing Master Plan with realistic method of statement
§Preparing Detailed Contractor Construction Schedule
§Analyzing B.O.Q. for an effective cost loading
§Updating of schedule & monitoring the work progress
§Perform detailed analysis of the schedule updates
§Revising of schedule logic according to site condition
Tamer Ali
Nov11 – Present Design, Procurement & Construction of Fire Stations at North Kuwait,
Quality Control Inspector, (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST)., Oil & Gas Pipe Line Project.
WORK EXPERIENCE:
Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).
Jan 2012 till now.
· Projects Undertaken:
Transport Coordinator, Agility Logistic Company in Kuwait, USARMY Logistics Project
Worked with AGILITY, Kuwait as Transport Coordinator from 2004 – 2010.
Responsibilities:
· Updating employees’ data as per their current documentation.
· Preparing application packages for the employees as initial, renewal and lost or damage badges (IB, USBC, J2 & Shuaiba Port Pass).
Mohammad Ayaz Khan
WORK EXPERIENCE:
Currently working as aQC INSPECTOR AT (KPIOS)(KUWAIT PIPE INDUSTRIES AND OIL SERVICE & ISO PLUS MIDDLE EAST).
Jan 2012 till now.
· Projects Undertaken:
Mamoon Ali
- Primavera P6
- Microsoft Excel
Planning Engineer & Site Engineer, Arabtec Construction LLC, College of Arts and Education - Kuwait University
1. Supervising and superintending the day to day site activities to deliver production to the maximum rate with the required satisfying level of quality according to the project specs.
2. Coordinating the materials (Formworks) recycle plan within the site to put them at the maximum level of efficiency
civil site eng. & planning eng., Arabtec Construction LLC, College of Arts and Education, Kuwait University Project
1. Supervising and superintending the day to day site activities to deliver production to the maximum rate with the required satisfying level of quality according to the project specs.
2. Coordinating the materials (Formworks) recycle plan within the site to put them at the maximum level of efficiency
Pagination
- Previous page
- Page 26
- Next page