Project Planning Engineer (Oil & Gas), Alghanim International General trading & Contracting Co., Water Management at GC’s 3, 4, 7 and 21 In SK area

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
6950
Experience Hours (Cost Management)
6950
Experience Hours (Forensic Analysis)
3550
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Project Planning Engineer (Oil & Gas), Arabi Enertech, Installation of Crude transit Pumps at GCs and Replacement of Separator Control Valve at SEK GCs

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
8850
Experience Hours (Cost Management)
8500
Experience Hours (Forensic Analysis)
3450
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Project Planning Engineer, Alghanim International General trading & Contracting Co., Construction of 500 MW OCGT Power Plant

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
2400
Experience Hours (Cost Management)
2400
Experience Hours (Forensic Analysis)
800
  • I developed logical linked overall integrated project execution programs (resourced and cost-loaded) that comply with the planning standard and client requirements
  • I prepared annual capital and operating budgets in line with the work program and prepared the forecast plan and budget
  • I Provided details on materials to ensure the procurement teams have early visibility of the project requirements
  • I prepared the Claims and Variation orders (both Time & Cost)
  • Monitor, control and analyze the project program and cost information using Earned Value methodo

Mechanical Engineer (site), XPO Technology General Trading & Contracting C.W.L.L, Prefabrication and site execution of pipe spools

J
Joyson John 👤 Member for 12 years 5 months
START Date
END Date
Experience Hours (Planning & Scheduling)
6300
Experience Hours (Cost Management)
1100
Experience Hours (Forensic Analysis)
350
  • Execute the Fabrication, Installation, testing and commissioning of pipeline worksand maintain the daily and weekly progress reports
  • Ensure the work progress is in line with the approved AFC drawing
  • Liaising with project management team to ensure deliverable like project materials and equipment’s to meet construction requirements.
  • To liaise with engineering team for the completion of approved construction (AFC) drawing and ensure complete transmittal of the same to site.
  • To study the vendor manuals for monitoring the materials delivery and ensuring all i

Ghassan Kabbara

First Name
Ghassan
Last Name
Kabbara
Professional Since
Oldest experience
Years Experience
15
Guild Accreditation
Awaiting Applicant
LinkedIn Profile
https://www.linkedin.com/in/kabbara/

Having more than 30 years of experience, wearing different hats. I have focused on managing the development and delivery of strategic initiatives, transforming and re-engineering operational processes.

leading Teams to deliver cost effective solutions and adding significant value to businesss, both financially and operationally is absolute delight.

Ozgur Colak

O
Ozgur Colak 👤 Member for 5 years 7 months
First Name
Ozgur
Last Name
Colak
Professional Since
Oldest experience
Years Experience
8
Telephone Number
+905438710140
LinkedIn Profile
https://www.linkedin.com/in/ozgur-colak/