Egypt (AF.EG)

EG

Corporate Lead Planning Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS) Co.S.A., All tender & Project Planning on a variety Building & Construction projects

A
Ahmed Fouad 👤 Member for 9 years 8 months
START Date
Experience Hours (Planning & Scheduling)
900

Planning and creating time schedules for tender projects as well as baseline creating for awarded projects .

Site Cost Lead, Tecnicas Reunidas, LNG Seagas Damietta (Egypt)

START Date
END Date
Experience Hours (Planning & Scheduling)
0
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
0

I worked as the LSTK EPC contractor for construction of LNG Train in Damietta, Egypt.  Project was a JV of KBR, JGC, Tecnicas Reunidas, and M.W. Kellogg. This project was extremely schedule driven, and the challenge was to reduce project costs without impacting the overall progress.  I did this through rigorous change management, detailed cost control down to WBS+5 level, and a very indepth manpower plan to ensure the right mix of talent stayed on the project.

Eman Abdeen

E
Eman Abdeen 👤 Member for 9 years 9 months
First Name
Eman
Last Name
Abdeen
Professional Since
Oldest experience
Years Experience
46

 

1. Computer Skills:

·     PCM v.14 -  P6 - Auto Cad 2D - ICDL  & Microsoft Office (Word, Excel, net, .. etc) - Adobe Acrobat

2. Personal Skills:

    ·  Reading - Internet Search

 

Document Control Lead, The Arab Contractors (Osman A. Osman& Co.), AbuQir Power Plant

E
Eman Abdeen 👤 Member for 9 years 9 months
START Date
Experience Hours (Planning & Scheduling)
1000
Experience Hours (Cost Management)
50

I graduated from the faculity of Engineering, Alexandria Univerisity in 2009 and get my deploma in construction Management in 2014 and now I am preparing my thesis for Master of science in construction management.

I work for the Arab Contractors Co.- Alex. Branch from August 2009 till now.

Now I am working in the Arbitration and claims department since August, 2015.

From January 2014 till July 2015, I worked in the Alex sector follow up department (Follow up projects and reporting).

Ahmed Hisham

First Name
Ahmed
Last Name
Hisham
Professional Since
Oldest experience
Years Experience
46
LinkedIn Profile
https://eg.linkedin.com/in/ahmed-hisham-032a5074
Facebook Profile
www.facebook.com/MyNameIsNe0

Engineer - Senior Planning, Industrial and Minning Projects Authority, Industrial and Minning Projects Authority

START Date
END Date
Experience Hours (Planning & Scheduling)
2000
Experience Hours (Cost Management)
2000
Experience Hours (Forensic Analysis)
2000
  1. All Panning phase for the industrial projects and constract a project schedule.
  2. Monitor and control the project plan.

Junior Engineer, Fathy Abd Rabu Construction Berau, (various projects)

H
Hassan Emam 👤 Member for 15 years 8 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
1500

I have worked on multiple building construction projects in Egypt as a junior engineer. I participated in three medium sized projects all in Alexandria

Civil Engineer / Planner, EGEC, WASTE WATER TREATMENT PLANT

A
Assem Osman 👤 Member for 9 years 11 months
START Date
END Date
Experience Hours (Planning & Scheduling)
3500
Experience Hours (Forensic Analysis)
500

• Developed comprehensive baseline CPM schedule.

• Updated schedules and analyzed manpower and cost allocations.

• Maintained a report of actual cost against estimated budget for all current projects at the site operations and submitted it monthly.

• Conducted CPM meetings to present information to subs and owners.

• Generated narrative reports.

• Time Impact Analysis.

Planning & Project Control Engineer, ARCHIRODON CONSTRUCTION (OVERSEAS), & Power infrastructure works and 132kv/66kv substation distibution station

A
Assem Osman 👤 Member for 9 years 11 months
START Date
END Date
Experience Hours (Planning & Scheduling)
1500
Experience Hours (Cost Management)
300
Experience Hours (Forensic Analysis)
100

 • Developed comprehensive baseline CPM schedule.

• Responsible for opening, updating and closing cost centers of the project.

• Allocated the resources for activities and calculate productivity of projects.

• Updated schedules and analyzed manpower and cost allocations.

• Cost Estimation.

• Maintained a report of actual cost against estimated budget for all current projects at the site operations and submitted it monthly.

• Forecasted the estimate at completion to anticipate the cost trend of the project.