planner, GB Building Solutions Ltd, variety

D
Dave Bunn 👤 Member for 16 years 7 months
START Date
END Date
  • Construction phase planning including:
    • Controls and early warning systems
    • Report writing and presentation,
    • As-built programming,
    • Progress drawings and photos
    • Critical path and float analysis
  • Tender planning including;
    • Pre-construction phase planning,            
    • Design and procurement controls and management,
    • Production of detailed methodology and logistics and

Preliminaries work book 

Network Rail Planner

JOB TITLE:          Project Planner



Since joining Network Rail in July 2006 I initially worked on the West Coast Main Line on the A09 Line Speed Enhancement Project. In November 2008 I have been transferred to the National Project Team based in York, in that time I have done the following activities at development stage:



•Created a high level P3/P3e schedule & updated it from the desktop scoping exercise done by the engineers.

Amalgamated Construction Co.Ltd Lead Planner

(Projects all over U.K and Overseas values from £50,000 to £100,000,000)



I was employed by Amalgamated Construction to assist with the planning of ongoing & future projects, from Railway Infrastructure & tunnels to reinstating car parks, this included:

•The redesign of the yard at the Barugh Green site involving all aspects of design and build planning.

•Estimating Planner, where I assisted the Estimators with Tender Schedules

•Sub-Contract Enquiries.

•Time / Location Plans.

•Kept their records up to date.

McNicholas Construction Services Planner

At McNicholas my function as a planner was to be involved with the project from pre –tender stage right through to six monthly / two yearly defect hand over stage.

The biggest and highest valued project was a telecommunications link for a company called Tycom Networks, the project was valued at £300,000,000.00 as it had submarine cables linking it to America, Canada and Norway and my duties included:

•Plan a feasible route from Filey North Yorkshire, down to Cambridgeshire & across to Leeds.

•Walk the routes in their entirety to position splice chambers & pulling boxes.